Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a playground / park / athletic field in Bon Accord, Alberta. Completed plans call for site work for a playground / park / athletic field.
The Town of Bon Accord is requesting proposals for the provision and installation of playground equipment (including borders and surfacing) in Centennial Park and Springbrook Park. 1. The Town is seeking innovative designs for two play spaces that correspond and compliment the existing play equipment in the following two parks: a. Play Space #1: Centennial Park: replacement of an old swing set with a new, inclusive play structure or several small play equipment choices that will fit in this space. Note, this park has an amphitheatre and is home to many community events throughout the summer months. Therefore, as per the map shown in Appendix #1, there is limited space for play equipment or structures. b. Play Space #2: Springbrook Park: replacement of the existing swing set with a new swing set that includes swings for all ages and abilities. This park has two possible placement locations for new swings: the existing location or a second location option according to the map shown in Appendix #2. The existing playground in this space will be replaced in the future, hence the new swing set will need to allow for future playground development. 2. The playground structure should be designed to accommodate children between the ages 5 - 12 years. 3. The playground must be inclusive/accessible for all children. 4. Maximize activity stations and play components for the stated budget. 5. The Town requires that the playground equipment be delivered and installed by the Proponent. The Proponent will also supply all materials, equipment, and labour required for the installation of the playground equipment. The Proponent will be responsible for excavating the site, removing old play equipment, and full installation of the new play equipment, surfacing and borders to current safety standards within the stated timelines. 6. The Proponent will be responsible for heavy metal fencing to be erected during the excavation, removal of old equipment and install of new equipment considering encroachment areas of existing play equipment. The fencing shall stay in place until the new play space may be opened to the public. The Proponent shall be responsible for removal of fence once the project is completed. 7. All proposals are to meet the following: a. CSA Compliant Children's Play Spaces and Equipment National Standard of Canada intended for use by children ages 5 - 12. b. Ability to fit into the area identified in appendix #1 and appendix #2. c. Ability to provide certificate or statement of compliance (including play equipment and installation) to CSA standards 8. Provide manufacturers and installation warranty and maintenance on playground surfacing, structures, and equipment. Centennial Park (Budget $50,000) Springbrook Park (Budget $65,000)
Award
Playgrounds / Parks / Athletic Fields
$106,642.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 28, 2023
August 28, 2023
Multiple Locations, Bon Accord, AB
Related To This Project
Bon Accord, AB
Bid Date: Jul 28 2023
Bon Accord, AB
Bid Date: Jul 31 2023
Bon Accord, AB
Bid Date: Jan 14 2022
Bon Accord, AB
Bid Date: Jan 27 2022
Bon Accord, AB
--
Bon Accord, AB
Bid Date: Mar 01 2022
Bon Accord, AB
Bid Date: Apr 02 2024
Bon Accord, AB
Bid Date: Apr 02 2024
Bon Accord, AB
Bid Date: Jul 13 2023
Bon Accord, AB
Bid Date: Jan 24 2023
Bon Accord, AB
Bid Date: May 22 2024
Bon Accord, AB
Bid Date: Jul 20 2022
Bon Accord, AB
Bid Date: Jul 25 2022
Bon Accord, AB
Bid Date: Jun 01 2022
Bon Accord, AB
Bid Date: Apr 20 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.