Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a bridge / tunnel in Center Township, Indiana. Working plans call for site work for a bridge / tunnel.
**As of August 28, 2023, bids received were rejected. No definite date for the rebid.** Any Proposals received after the above designated time will be returned unopened. The proposed construction will include replacement of an existing culvert and storm sewer, grading of relocation, and associated pavement and lawn restoration. All proposals must be submitted on Prescribed State Board of Accounts Form No. 96 together with all the proper forms included in the specification, proposal and contract the entire set of which shall be intact as a bid Wage rates for this work shall not be less than the prescribed scale of wages as determined pursuant to the provisions of Chapter 319, Acts of the Indiana General Assembly, 1935. No Contractor may withdraw his proposal within one hundred twenty days (120) after the actual date of the opening thereof. The Board of Commissioners reserves the right to reject any or all proposals, to waive technical or irregularities therein, to delete any item or items and to award a contract on the proposal that in their judgment is most advantages to Lake County
Final Planning
Bridges / Tunnels
$482,000.00
Public - County
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 19, 2023
February 28, 2024
83rd Ln, Center Township, IN
Related To This Project
Center Township, IN
Bid Date: Jan 12 2022
Center Township, IN
--
Center Township, IN
Bid Date: Jan 25 2022
Center Township, IN
Bid Date: Jan 25 2024
Center Township, IN
Bid Date: Mar 05 2024
Center Township, IN
Bid Date: Mar 13 2024
Center Township, IN
Bid Date: Apr 10 2024
Center Township, IN
Bid Date: Mar 15 2023
Center Township, IN
Bid Date: Sep 14 2022
Center Township, IN
--
Center Township, IN
--
Center Township, IN
--
Center Township, IN
Bid Date: Jan 25 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.