BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a mixed-use development in Madera, California. Completed plans call for the demolition of a educational facility; and for site work for a educational facility.

The Contractor shall perform all Work within the time stipulated the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor's failure to comply with this obligation, and the Contractor shall not be excused with respect to any failure to so comply by act or omission of the Construction Manager, Architect, Engineer, Inspector, Division of the State Architect, or representative of an of them, unless such act or omission actually prevents the Contractor from fully complying with the Contract Documents and the Contractor protests, in accordance with the Contract Documents that the act or omission is preventing the Contractor from fully complying with the Contract Documents **As of July 24, 2023, bids were rejected. No definite date for the rebid.** Bids shall be accompanied by a certified check, cashier's check , or bidders bond in an amount not less than ten (10%) percent of the total bids made payable to MUSD. The substitution of appropriate securities in lieu of retention amounts from progress payments in accordance with public Contract Code Section 22300 is permitted. To the extent required by Public Contract Code Section 20103.7, the District shall also make the Contract Documents available for review at one or more. Pursuant to the provisions of Section 1770 et seq of the California Labor Code, each worker of the contractor and any of its subcontractors engaged in work on the Project shall be paid not less than the prevailing wage rate. SB 854 established new public works contractor registration program requirements for all public works projects. Pursuant to Labor Code Section 1725.5; Starting March 1st, 2015 no contractor/subcontractor may be listed in a bid proposal unless registered with the Department of Industrial Relations (DIR). Starting April 1st, 2015 no contractor/subcontractor may be awarded a contract, nor employed on a Public Works project unless registered with the DIR. This project is subject to prevailing wage requirements and compliance monitoring and enforcement by the DIR and may at any time require contractors/subcontractors to upload electronic certified payroll records on the DIR website. Bidders shall be required to have a valid class "B or C21" Contractor's License. Refer questions to Susan Harautuneian via email @ susanharautuneian@maderausd.org no later than July 12, 2023 @ 10:00:00 am. Only questions received via email will be responded to. Removal and disposal of asbestos in accordance with State of California Asbestos Abatement Specifications, San Joaquin Valley Air Pollution Control District, and the federal Clean Air Act (and all implementing regulations) o Demolition and removal of building, basements, concrete/asphalt slabs, and foundations. o Demolition and removal of site improvements, including but not limited to foundation, parking asphalt, water fall retaining wall, septic tank, concrete patio, in-ground swimming pool and concrete sundeck. Below grade structures, foundation and basement slab shall be totally removed. Remove all vegetation around both buildings with the exception of large trees. Remove all fencing and fence posts. o Filling of the demolition site with clean lead-free soil, to meet existing site grades, in 6" lifts, compacted as necessary to stabilize the material and eliminate excessive settling. o Remove air-conditioning equipment without releasing refrigerants. o Dust shall be suppressed by a continuous water spray during demolition. o All salvage materials resulting from work under this contract and located within the specified areas will become the property of the contractor. o Wells, well pumps and water storage tanks are to remain. o This Project shall be Prevailing Wage

Bid Results

Educational

$104,177.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

16

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
59
Bidding Soon
897
All Active Projects
394
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 11, 2023

September 11, 2023

December 10, 2023

img_map_placeholder

13568 Rd 26 1/2, Madera, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.