BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Los Angeles, California. Completed plans call for the renovation of a municipal facility.

The Hall of Administration Base Isolation Seismic retrofit project consists of the installation of seismic isolators under the foundation of the existing building. Hydraulic jacks and temporary load-bearing shoring will be installed in phases to support and transfer the gravity loads from the existing columns/walls to new support foundations. Seismic strengthening of the superstructure using new concrete shear walls is required at selective locations. A moat gap will be constructed around the building perimeter using earth-retention walls. Shoring and earthwork operations will require demolition and reconstruction of the existing site around the building. The M/E/P scope consist of adjustments, alterations, temporary offsets, and new replacements to accommodate for the new structural systems and seismic movement of the building. All underground utilities will be modified with flexible connections where the utility lines pass through the perimeter moat gap. This project will be performed at an active site where the building is occupied during typical work hours. Temporary provisions of various sorts will be accommodated so as not to disrupt the occupants of the building. Work categories include: Shoring & Underpinning, Shotcrete, Rebar Key Subcontractor Qualifications:Design-Build experience for: Earth-retention Shoring Systems; bondable and prequalified with McCarthy Building Co.; experience completing base isolation seismic retrofit projects using deep permanent and temporary, free standing, earth retention systems using tiebacks, soil nailing or other strategies of similar scope. This project requires: - Prevailing Wages - Traditional Insurance - Design and oversight services by a qualified, licensed California Professional Engineer in collaboration with the existing Design & Engineering Team. - Community Workforce Agreement McCarthy is an equal opportunity employer and encourages qualified Small Business and Minority Business participation. All qualified applicants will receive consideration for employment without regard to race, religion, sex, or national origin. PLEASE NOTE: The overall construction estimate is approximately $270 million. The approximate construction cost of this bid package is not yet known.

Post-Bid

Municipal

$50,000,000.00

Public - County

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
120
Bidding Soon
2,201
All Active Projects
1,013
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2023

February 1, 2024

img_map_placeholder

500 W Temple St, Los Angeles, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.