BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling and renovation of a mixed-use development in Stillwater, Oklahoma. Completed plans call for the renovation of a educational facility.

**Note from CM: Bid Package 11J.2 - Wall Pads has been removed from this bid. It will be redesigned, re-advertised and bid in the future. Boone Pickens Stadium Seating Enhancement Project - Southside Phase 2 Oklahoma State University, hereinafter referred to as Owner and Flintco, LLC, hereinafter called the Construction Manager. This project at Boone Pickens Stadium includes seating bowl enhancements including replacing the existing cast in place and steel bent plate treads and risers for the North and South Sidelines with long span aluminum treads and risers and bench seating. In addition, alignment of the 200 level vomitories with the 300 level vomitories, adding additional intermediate aisles and handrails, and providing additional wheelchair spaces within the seating bowl. The existing concrete field wall will be removed and reconfigured in concrete with a coping cap in the northeast and southeast portions of the stadium. Existing field wall pads will be removed and new wall pads will be installed around the entire perimeter of the field. The new bowl configuration will include chairback seating, loge box and terrace seating areas. Provision of the required number of wheelchair spaces to meet current 2010 ADA Standards for Accessible Design will be included as part of the project. The overall stadium seating capacity will be reduced as part of the renovation. The west endzone portion of the stadium will have the existing bench seating and supports removed along with the removal of the existing traffic coating, expansion joint and control joint materials currently in place. The existing precast stadia will be prepped for new traffic coating, new expansion and control joints will be provided. The existing bench seating will be reinstalled to their original locations. Rails will be reinstalled and painted. New rails will be provided as needed. **Estimate Value listed is for the Overall project INTERPRETATION OR CORRECTION OF BIDDING DOCUMENTS: Should a Bidder find discrepancies in, or omissions from, the bid documents, or be in doubt as to their meaning, he must notify the Construction Manager in writing seven (7) calendar days prior to the bid opening. Replies shall be issued to all bidders of record by Addendum or CM Clarification to the bid documents and shall become part of the contract. The Owner shall not be responsible for oral clarification. All addenda or CM clarification items issued during the time of bidding shall be covered in the bid and acknowledged on the proposal. The Contract and Bidding Documents will be available at Gill Reprographics. Copies of the contract and bidding documents may also be reviewed at the

Post-Bid

Educational

$40,000,000.00

Public - State/Provincial

Remodeling, Renovation

146

32

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
62
Bidding Soon
953
All Active Projects
426
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 27, 2023

September 25, 2023

img_map_placeholder

700 W Hall of Fame Ave, Stillwater, OK

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.