BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 22, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of an educational facility in San Mateo, California. Completed plans call for the renovation of a educational facility.

The Work generally consists of the replacement of the existing Liebert Unit Model FH267W-AA00 in the Data Center of the District Office. The new unit must have the same capacity as the current Liebert, including all associated mechanical and electrical work and integration into the facility management system (BMS). The scope includes replacing an existing CW pump on the cooling tower. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Question Deadline 07/25/2023 at 2:00 PM PT Bidders must direct all questions about the meaning or intent of Bidding Documents to District Representative in writing and must be submitted electronically by posting same to the Districts Online Vendor Portal

Award

Educational

$185,350.00

Public - County

Renovation

9

9

2

8

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
437
Active Projects
214
Bidding Soon
3,088
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2023

September 1, 2023

Project location map

To Be Determined, San Mateo, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.