BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a library in Wheaton, Illinois. Completed plans call for the renovation of a library.

The City of Wheaton is requesting construction services for improving the electrical system at Liberty Square in Downtown Wheaton. Liberty Square is a 1/3-acre park on the northwest corner of West Liberty Dr and West St. The park is on the south side of the Downtown Wheaton Metra Train Station, and on the north side of a PACE bus stop on Liberty Dr. The project involves upgrading the existing electrical service to feed the existing loads for a traffic signal and lighting and adding loads for new receptacle pedestals. The work will involve replacing an old controller cabinet with a new controller cabinet, connecting a new electrical service, and installing a site electrical power distribution system that includes conduit layout, hand-holes, and 14 receptacle pedestals. The City reserves the right to modify the estimates, or remove them in their entirety, whichever is in the best interests of the City. When specifically requested by the City, Bidder shall provide a Bid Bond / Bid Deposit of 10% of the full Contract price.Maintenance Bond IS Required. The successful Bidder shall be required to furnish a Maintenance Bond equal to ten percent (10%) When specifically requested by City in Exhibit A, Contractor shall furnish with the executed Agreement, performance and payment bonds equal to one-hundred and ten percent (100%) of the full contract price, on forms approved by the City, as security for the faithful performance and completion of all the Contractor's obligations under the Contract Documents, including, but not limited to Contractors Prevailing Wage Act obligations under this Agreement, and covering the payment of aII materials used in the performance of this Agreement and for all labor and services performed under this Agreement. Question Deadline 07/21/2023 at 11:00 AM CT All questions, either administrative or technical, shall be submitted via email to Tina Walters at twalters@wheaton.il.us

Bid Results

Library

$83,000.00

Public - City

Renovation

9

4

6

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
116
Bidding Soon
1,822
All Active Projects
812
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 27, 2023

August 28, 2023

img_map_placeholder

402 W Liberty Dr, Wheaton, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.