EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 19, 2023 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Victorville, California. Completed plans call for site work for a pipeline; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of September 19, 2023, project was awarded to C.A. Rasmussen, Inc, awarded amount is $8,944,073.46.** The Project includes the reconstruction of approximately two miles of Bear Valley Road, a super arterial located between US 395 and Amethyst Road in the City of Victorville. The principal scope of work will include full depth reconstruction of existing road pavement incorporating new asphalt concrete pavement, new crushed aggregate base, recycled milled asphalt base and earthwork. The work will further include placement of pavement markings, demolition and or placement of portland cement concrete curb & cutter, cross gutters & spandrels, sidewalks, drive approaches and ADA accessible curb ramps. Support Work will include temporary traffic control and storm water pollution prevention through the use of Best Management Practices and weekly inspections. Included in this bid are two small projects incorporating similar work, but further includes electrical, irrigation, landscaping and masonry wall construction. Restrictions will be in place for use of equipment and operation for work performed adjacent to or under: Kinder Morgan fuel pipelines, Southern California Edison high voltage power transmission lines and Los Angeles Department of Water and Power high voltage power transmission lines. Each Bid Proposal shall be accompanied by: (a) cash; (b) a certified or cashier's check; or (c) a bidder's bond made payable to City of Victorville in an amount equal to ten percent (10%) of the Total Base Bid as bid security. Said Bid Guaranty shall be enclosed in the same envelope as the Bid Proposal and no bid shall be considered unless such Bid Guaranty is enclosed therewith. The successful Bidder will be also required to furnish performance and payment bonds, each in an amount equal to one hundred percent (100%) of the Total Base Bid. Bidders must be licensed in accordance with the "Contractor's License Law," Chapter 9 of Division 3 of the California Business and Professions Code. At the time of submitting the bid, Bidders must possess a valid Class A California Contractor's License The Design Engineer has calculated an estimate of probable construction costs for this project. The City does not wish to publicize the engineer's estimate of the project cost since this information may tend to influence the number and nature of bids received. However, for the bidder's convenience, the City will publicize that the engineer's estimate for the base bid falls within a range of $7,750,000.00 TO $8,500,000.00 All questions, other than those asked at the pre-bid meeting and not specifically addressed within the Contract Documents, must be submitted in writing to cmcalderon@victorvilleca.gov. Questions will not be accepted after 12 p.m. on THURSDAY, July 27, 2023. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$8,500,000.00

Public - City

Paving, Site Work

48

6

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Concrete Curing
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
264
Active Projects
130
Bidding Soon
2,154
All Active Projects
1,011
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 3, 2023

October 2, 2023

img_map_placeholder

Bear Valley Rd, Victorville, CA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Bear Valley Road Reconstruction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.