BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 2, 2023 at 8:00 PM

Updated January 27, 2024

Renovation of a transportation facility in Stuart, Florida. Completed plans call for the renovation of a transportation facility.

As of September 8,2023, this project has not yet been awarded. A timeline for award has not yet been established. Removal of the existing Automated Weather Observing System (AWOS) - III, located in the southwest quadrant of the Martin County Airport at Witham Field between Runway 12, Runway 7, and Taxiways Charlie installation of the new Automated Weather Observing System - Level III P/T (AWOS-III P/T) in the same location. All new AWOS equipment, tower, concrete pad, and connections will be constructed. This project is being supported, in whole or in part, by a State of Florida Department of Transportation (FDOT) Public Transportation grant agreement (FPN: 451518-1-94-01 / Contract #: G2H57) and a U.S. Department of Transportation Federal Aviation Administration (FAA) Airport Improvement Program (AIP) grant agreement. Therefore, the successful contractor and its subcontractors shall comply with all terms and conditions of the grant agreement and all federal, state, and local laws and regulations applicable to this Project. Martin County is seeking bids from licensed Contractors for the removal of the existing Automated Weather Observing System (AWOS) - III, located in the southwest quadrant of the Martin County Airport at Witham Field between Runway 12, Runway 7, and Taxiways Charlie installation of the new Automated Weather Observing System - Level III P/T (AWOS-III P/T) in the same location. All new AWOS equipment, tower, concrete pad, and connections will be constructed. The County reserves the right to request a written confirmation of the bid and the responsibility of the bidder prior to the awarding of the Contract. the Bid Bond, the bid may be accompanied by a certified check of any national or state bank made payable to the County in the amount of 5% of the total bid amount. Any certified check that may be received will be returned to the unsuccessful bidder(s), within thirty (30) calendar days after the opening of the bids.

Award

Transportation Terminals

$299,130.00

Public - County

Renovation

8

9

2

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
75
Bidding Soon
1,345
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 2, 2023

September 1, 2023

Project location map

Multiple Locations, Stuart, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.