BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Tucson, Arizona. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; and road / highway.

The purpose of this letter is to provide notice of award for the Request for Quote (RFQ), referenced above, for the Coronado National Forest. Four (4) offers were received in response to the RFQ posted at sam.gov Contract Opportunities, on July 6, 2023, and closed August 15, 2023. A Technical Evaluation Panel (TEP) was set up to review submitted offers in accordance with criteria set forth in FAR 15.101-2 - Lowest Price Technically Acceptable Source Selection Process and the factors in and Section M of the solicitation. The Contracting Officer reviewed all of the TEP's work in assessing each offer, then the recommendation for award and the following offer was determined to be best value for award: RR&K Kramme, RLLLP, 26764 W. High Creek Rd., Willcox, AZ in the amount of $465,775.00 All of the Base and Option Line Items have been accepted for a Total Price $465,775.00 Upon receipt of this email document, you will have been provided the award debriefing. If you desire an additional debriefing, you have three-days after receipt of this notice to make that request. The Government appreciates your participating in this procurement and looks forward to your involvement in future federal procurements. If you have any questions, please contact the undersigned by email at michelle.l.bahr@usda.gov Description of Work: Work consists of improving three separate existing road segments totaling 3.2 miles and two parking lots totaling 0.85 acres. The project area is located near Carr and Brown Canyons on the eastside of the Huachuca Mountains. Features to be improved are designated Parking Lot 1, Parking Lot 2, Brown Canyon Road, Carr Canyon Road, and Carr Canyon Road Additional (See Location Map to be posted with solicitation documents). The road segments and parking lots are comprised of native surface material with minimal drainage features. The improvement work is meant to increase the drivability and durability roads and parking lots. Location: 31.4639037629, -110.291590373 (Brown Canyon Ranch entrance). 799 E Ramsey Canyon Road, Hereford, AZ 85615. Basis for Award: The Government Anticipates awarding a Firm Fixed-Price Contract using RFQ Lowest Price -Technically Acceptable: Award will be made to the offer that meets or exceeds the requirements contained herein, at the price that is most advantageous to the government will be determined to be the best value. Price reasonableness will be determined by using competitive solicitation process. Site Visit July 18, 2023 @ 9:00 am PT (Arizona) Location: 31.4639037629, -110.291590373 (Brown Canyon Ranch entrance). 799 E Ramsey Canyon Road, Hereford, AZ 85615. Contact the Contracting Officer Representative (COR): Jenna Livingston - Jenna.Livingston@usda.gov Magnitude of project is between $250,000 and $500,000. This project is a 100% Small Business Set-Aside. The small business size standard for NAICS 237310 45M Davis-Bacon wages apply. Payment and Performance bonds are required. Contact: Michelle Bahr Contract Specialist (928) 333-6278 michelle.l.bahr@usda.gov Send questions to michelle.l.bahr@usda.gov no later than August 1, 2023, at 1:00 pm PT (Arizona) In order to be eligible for award of a Federal Contract, potential vendors need to already be registered in the System for Award Management (SAM) www.sam.gov Offer Submissions: Offerors shall submit the Return Packet - including a Business Proposal and a Technical Proposal. The required information SF1442, Section B and K (business proposal) and Section M (technical proposal) of the solicitation. Offers or responses to the solicitation (include the solicitation number in the name of the document - 127EAX23Q0075) may be sent to the Contracting officer by email: michelle.l.bahr@usda.gov before the deadline. The Deadline for receipt of responses to the RFQ shall be August 15, 2023 @ 1:00 pm PT (Arizona) The complete solicitation package will be attached and made available only through SAM.gov, https://sam.gov/content/home on or within 15 days of this notice. Anyone wishing to participate in this proposed procurement must obtain their copy from SAM.gov. Copies will not be mailed from the Contracting Office. All amendments will be posted on SAM.gov. All future information about this acquisition, including amendments, will be distributed solely through this site. Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition. All responsible sources may submit a response to this announcement which will be considered by this agency. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Work consists of improving three separate existing road segments totaling 3.2 miles and two parking lots totaling 0.85 acres. The project area is located near Carr and Brown Canyons on the eastside of the Huachuca Mountains. Features to be improved are designated Parking Lot 1, Parking Lot 2, Brown Canyon Road, Carr Canyon Road, and Carr Canyon Road Additional (See Location Map). The road segments and parking lots are comprised of native surface material with minimal drainage features. The improvement work is meant to increase the drivability and durability roads and parking lots. Improvement work includes: 1) Hauling, spreading, and compacting 4 inches of surface coarse aggregate (grade G), conforming to Forest Service standards, on road segments and parking lots. 2) Establishing 14-foot-wide, 4% crowned road prisms with 1.5-foot-deep, 2:1 v-ditches on road segments (See Location Map) 3) Establishing 2-3% out-sloped drainage on parking lots. Main bid item: 1) Parking Lot 1 And Brown Canyon Road Surfacing. 0.75 miles of road and 24,500 square feet of parking area Additive bid items: 1) Carr Canyon Road Surfacing. 2.1 miles of road 2) Carr Canyon Additional Road Surfacing. 0.25 miles of road 3) Parking Lot 2 Surfacing. 8,500 square feet of parking area Total contact time from Notice to Proceed to completion shall be no more than 60 days. Prior to mobilization, the contractor shall submit and receive approval on a Temporary Traffic Control Plan. Such a plan must comply with the most current version of the Manual on Uniform Traffic Control Devices (MUTCD). Contact the COR for such approval. Temporary traffic control for Carr Canyon Road will close the road to all use during weekdays except for the occasional use of the road by an elderly resident (or family/visitors) who lives up Carr Canyon. During daylight hours a flagman must be provided at the road closure point (the existing swing gate at the end of pavement) to operate the gate for this resident (or family/visitors) as well as to accommodate contractor's delivery vehicles while excluding the public. Occasional use by Border Patrol should be expected as well. The segment of road involved in the contract shall be fully open and made

Award

Roads / Highways

$465,775.00

Public - Federal

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
10
Bidding Soon
439
All Active Projects
159
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Winning Bids!

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 15, 2023

September 14, 2023

img_map_placeholder

Multiple Locations, Tucson, AZ


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.