BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 18, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a civil project in East Derry, New Hampshire. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; and water / sewer project.

The Project consists of replacing two culverts with an 8' span x 6' rise x 56' long precast concrete box culvert structure, water and sewer mains replacements, as well as partial reconstruction of Franklin Street for approximately 140' The anticipated project schedule is to start construction about June 17, 2024 and complete construction about August 30, 2024. Bids shall be on a unit price basis, as indicated in the Bid Form. All technical questions regarding this project should be directed by email to Josif Bicja at jbicja@hoyletanner.com. Bidders must be listed on the NHDOT "Prequalified Contractor's List" with a classification of bridge and/or bridge rehabilitation, or box culvert, or water/sewer, or road construction and provide written documentation to Josif Bicja, jbicja@hoyletanner.com, or Donna Akerley, dakerley@hoyletanner.com from NHDOT no later than 3 business days prior to the date and time of the Bid Opening. Bidsreceived from bidders who are not on the specified classifications of the NHDOT "Prequalified Contractor's List" will not be accepted. The engineer's estimate for the work is between $600,000 and $650,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$843,840.00

Public - City

Paving, Site Work

28

11

6

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
664
Active Projects
374
Bidding Soon
4,640
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2023

June 17, 2024

Project location map

Franklin St, East Derry, NH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.