BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Sikeston, Missouri. Design plans call for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; road / highway; and for paving for a road / highway.

As of February 13, 2024, a design team has been identified. Location: Various Locations including Legion Park (between Malone Avenue and Front Street and between Kingshighway and Scott Street); and Rail Trail from Legion Park along Railroad ROW from Scott Street west to Sunset Drive. Various Improvements May Include: Rail Trail Extension Removing street for additional green space Construct new restroom building Construct new City Market pavilion Additional park features as identified This will include the design, construction, and inspection. Length: Rail Trail Section: 5,600 ft The City of Sikeston is requesting the services of a consulting landscape architecture and/or engineering firm to perform the described professional services including design and construction inspection services for the project included on the attached list. If your firm would like to be considered for these consulting services, you may express your interest by responding to the appropriate office, which is indicated on the attachments. Limit your letter of interest to no more than 10 pages. This letter should include any information which might help us in the selection process, such as the persons or team you would assign to each project, the backgrounds of those individuals, and other projects your company has recently completed or are now active. It is required that your firm's Statement of Qualification (RSMo 8.285 through 8.291) be submitted with your firm's Letter of Interest or be on file with the City of Sikeston. The statement of qualification is not included in the total page count limit. The method of Contractor Selection has not been Determined at this time.

Design

Playgrounds / Parks / Athletic Fields

$1,322,716.00

Public - City

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
22
Bidding Soon
339
All Active Projects
118
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2024

img_map_placeholder

Multiple Locations, Sikeston, MO


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.