BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Litchfield, Maine. Working plans call for the renovation of a municipal facility.

** As of 07/26/2023, They received no bids on the project. The Town of Litchfield will accept bids for sill/deck repair of the Litchfield Town Office. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com The Town of Litchfield is inviting quotes for the project outlined below. The porch at the Town Hall building is in need of repair or replacement. Facing the front of the building, there is an ADA ramp on the right side, the main porch section immediately in front of the main entrance and an L-shaped extension to the left to access the egress door. The porch area is in need of repair and due to the porch deck construction, water has been leaking into the supporting lower walls. This has been pronounced due to the building roof lines which concentrate the water and snow from the roof directly onto the deck. All construction must meet Maine's MUBEC standards.. Resolution: It is proposed to remove the L-shaped section on the left-hand side of the deck from a point just inside the main roof, around the corner and in front of the egress door. The sills and supporting studs and sheathing against the building are rotted and need to be replaced. The material for this area must be pressure treated lumber with proper weather shield material and drip edge. A new deck -approximately 4' x 6' - should be constructed in front of the egress door. The top of this deck should be 3' or more below the threshold of the egress door. It is recommended that a composite decking material such as TREX Transcend or equivalent be used to preclude additional maintenance in the future. A set of stairs needs to be constructed from this deck to the ground level. The deck and stairs should have a 42" high railing and the undersides should have lattice work with TimberTech AZEK or equivalent trim. The remaining deck section and the ADA ramp should also be reconfigured, and reconstructed where necessary, to prevent water from entering the structure. There are also rotted sills and supporting members in this area. Any new structural members

Final Planning

Municipal

$200,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
13
Bidding Soon
403
All Active Projects
154
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2023

January 26, 2024

img_map_placeholder

2400 Hallowell Rd, Litchfield, ME

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.