Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a detention facility in Danville, Kentucky. Completed plans call for the renovation of a detention facility.
**As of August 25, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** Project Description: This Project involves the complete demolition, removal, and disposal of the existing Boiler No. 1 and the exterior masonry stack and breech way at the boiler house structure at the Northpoint Training Center. Demolition/General Project Tasks include, but are not limited to, the following: - Demolish and dispose of the masonry stack and its foundation. - Demolish stack breech way connection to the existing boiler house structure. Provide for a closure of the remaining wall penetration into the boiler house. - Demolish Boiler No. 1 and legally dispose of all hazardous materials. - Disconnect/Terminate/Cap off any utilities as indicated. - Disconnect/Remove/Partially demolish any piping, conduits, platforms, access, or other materials which connect to Boiler No. 1. Remove and terminate in a safe manner such that remaining structures, piping, etc. is left in a stable (not unsafe) condition. - Remove/Move/Shift any and all other equipment/pads/etc. which may impede the removal of Boiler No. 1 materials. Items that are removed from the building shall be disposed of in a legal manner. Items to remain in the boiler house shall be left in a stable (safe) condition. - Provide for disposal of uncontaminated materials on the Northpoint Training Center site in specified location. All other materials to be legally disposed of offsite. The building does contain hazardous materials which are identified in the Contract Documents. Qualified abatement personnel shall be included on the Contractors team to properly remove, handle, and dispose of such material in a safe and legal manner. Utilities connected to the structure shall be disconnected as indicated on the drawings by appropriate subcontractors who are licensed in each discipline of work including, but not limited to, Electrical, Plumbing, Gas, and any other utilities noted. Work includes site restoration and site improvements. All bids shall be accompanied by a bid guarantee (in the form of a bid bond or certified check) of not less than five (5%) percent of the amount of the lump sum base bid. A 100% Performance Bond and a separate 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instructions to Bidders and/or General Conditions. Bonds should be executed by a surety company authorized to do business in the Commonwealth of Kentucky. Estimated Length of Project: 120 (Substantial Completion) + 15 (Final Completion) NO QUESTIONS WILL BE ANSWERED AT THE SITE VISIT. ALL TECHNICAL QUESTIONS SHALL BE EMAILED TO THE ARCHITECT/ENGINEER OF RECORD FOR THIS PROJECT.
Bid Results
Jails / Prisons
$140,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 3, 2023
September 4, 2023
710 Walter Reed Rd, Danville, KY
Related To This Project
Danville, KY
Bid Date: Sep 06 2023
Danville, KY
Bid Date: Jul 18 2023
Danville, KY
Bid Date: Aug 01 2023
Danville, KY
Bid Date: Sep 12 2023
Danville, KY
Bid Date: Sep 28 2023
Danville, KY
Bid Date: Sep 28 2023
Danville, KY
Bid Date: Sep 28 2023
Danville, KY
Bid Date: Jan 12 2022
Danville, KY
Bid Date: Jul 18 2023
Danville, KY
Bid Date: Jul 11 2023
Danville, KY
Bid Date: Jun 29 2023
Danville, KY
Bid Date: Jun 22 2023
Danville, KY
Bid Date: Jun 22 2023
Danville, KY
Bid Date: Jun 14 2023
Danville, KY
Bid Date: Jun 13 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.