Site work and paving for a mixed-use development in Upper Makefield, Pennsylvania. Completed plans call for site work for a playground / park / athletic field; and for paving for a playground / park / athletic field.

As of August 25, 2023, this project has not yet been awarded. A timeline for award has not yet been established. The Project includes a base bid and three (3) alternates in Upper Makefield Township. The base contract includes the construction of four (4) pickleball courts, 8 foot high perimeter fencing, nets and foundations, 2 fence gates to enter the playing area, court painting, line painting, etc. Alternate #1 includes substituting a 10' high perimeter fence for the 8' high fence included in the base bid. Only the cost difference between a 10' high perimeter fence and the 8' high fence shall be entered for alternate #1. Alternate #2 includes the installation of an asphalt walking path from the existing handicap parking spaces to the location of the new pickleball courts. Alternate #3 includes the installation of eighteen (18) additional parking spaces using previous asphalt. Clarification Deadline 7/20/2023 7:30 AM Each bid shall be submitted in accordance with the Instructions to Bidders and must be accompanied by a Bid Bond or Certified Check for not less than ten percent (10%) of the Bid amount payable to the Township of Upper Makefield along with an Agreement of Surety certifying that the required Performance and Payment Bonds will be provided to the Bidder. The successful Bidder shall be required to furnish proof of insurance and bonds for Performance, Payment, and Maintenance in such form as meets the approval of the Township of Upper Makefield and having as security thereon such Surety company or companies as are approved by the Township of Upper Makefield. A pre-bid meeting will not be held for this project. This project is subject to applicable provisions of Act 422, Pennsylvania Prevailing Wage Act as amended and the prevailing minimum wage rates issued by the Pennsylvania Department of Labor and Industry. No Bidder may withdraw his bid within sixty (60) days after the date set for the opening of the bids. The Township of Upper Makefield reserves the right to reject any and all bids for any cause whatsoever, to eliminate any item or items from the contract, and to waive any informality in the bids. CLARIFICATION DEADLINE 7/20/2023 7:30 AM Completion Date : within 45 calendar days

Bid Results

Playgrounds / Parks / Athletic Fields

$177,959.00

Public - County

Paving, Site Work

8

17

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Painted Pavement Markings, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts

Find More Local Projects

Within 75 Miles of This Project
485
Active Projects
299
Bidding Soon
4,761
All Active Projects
2,029
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2023

August 24, 2023

img_map_placeholder

Multiple Locations, Upper Makefield, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2023 Pickleball Court Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.