BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Lincoln, Nebraska. Completed plans call for the construction of a 25,140-square-foot educational facility; and for site work for a educational facility.

Task Order No. W9128F21F0082 W9128F22F0082 HDR Project No. 10342687A Construct a US Department of Agriculture (USDA), Agricultural Research Service (ARS), research Headhouse and Greenhouse facility at the Nebraska Innovation Campus (NIC), University of Nebraska , Lincoln, Lincoln NE in support of the National Center for Resilient and Regenerative Precision Agriculture (NCRRPA). This project will be executed using a design-bid-build (DBB) project delivery method, which will require the contractor to provide the government with a complete facility and warranty based on the Request for CENWO intends to acquire Construction Services for the NCRRPA HH/GH facility project. Provide a 15,000 GSF Greenhouse and 10,140 GSF Headhouse to be physically connected to the existing Greenhouse Innovation Center (GIC) on the Nebraska Innovation Campus and provide for a future physical connection to a future USDA-ARS Lab/Office Building (LOB) to the east of this project. The Headhouse will be constructed from interior masonry walls for durability and an exterior skin to complement the existing GIC and the future LOB design. Power supply for greenhouse will be within the headhouse and distributed to environmental contact panels located at each zone in the corridor. Water supply will be in the headhouse and distributed to each zone via corridor. The Headhouse will be physically connected to the GIC to prevent winter shock to plants moved between the two structures and to facilitate collaboration. The Headhouse will also be physically connected to the future LOB to facilitate deliveries and movement of research material and USDA-ARS personnel back and forth to the Headhouse and Greenhouse research space Estimated Construction Costs: The estimated construction cost of this project is between $10,000,000 and $25,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Educational

$25,000,000.00

Public - Federal

New Construction, Site Work

167

36

86

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
26
Bidding Soon
392
All Active Projects
152
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 26, 2024

December 30, 2024

img_map_placeholder

2021 Transformation Dr, Lincoln, NE


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.