Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 5, 2026 at 7:00 PM
Updated January 6, 2026
Renovation of a water / sewer project in Portsmouth, New Hampshire. Design plans call for the renovation of a water / sewer project.
The Pease Treatment Facility Was Original Constructed in the 1950s and Was Upgraded in the 1990s. Selected Upgrades Have Been Completed Since the 1990s With the Headworks and Primary Clarifier Project Completed in 2021. Much of the Facility Has Exceeded Its Useful Lifespan and Needs Replacement. The City Received an Updated Npdes Permit Allowing for an Increase in Design Flow Rate From 1.2 Million Gallons Per Day to 1.77 Million Gallons Per Day. This Increase in Flow Was to Accommodate a Request From Lonza Biologics for Potential Expansion of Their Manufacturing Capacity. In February 2023, the City Was Notified That the Request for an Increase in Flow Was No Longer Required Due to Water Conservation Upgrades and Manufacturing Process Changes Completed by Lonza Biologics. Since No Additional Flow is Required to Accommodate Lonza's Expansion Needs, the City is Changing Its Project Scope to Only Include Critical Refurbishment of Existing Equipment. Initial Engineering Design for the Necessary Upgrades is Underway. Funding Under the Bond Category Represents the Costs to Design and Construct Replacement of Aged Equipment at the Existing Facility. Costs Are Preliminary and Will Be Refined as the Design Moves Forward. The City is Working to Fund This Project Using Revolving Loan Funds (Srf) to Take Advantage of Principal Forgiveness, Lower Interest Rates and Favorable Construction Financing As of January 5, 2026, this project is included in the Portsmouth School Department Fiscal Year 2025-2030 CIP. It has entered the design phase, but a timelien for construction has not yet been established.
Design
Water / Sewer
$25,000,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 2, 2026
135 Corporate Dr, Portsmouth, NH
Related To This Project
Portsmouth, NH
--
Portsmouth, NH
Bid Date: Jul 24 2024
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
