BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Portsmouth, New Hampshire. Conceptual plans call for the renovation of a water / sewer project.

The Pease Treatment Facility Was Original Constructed in the 1950s and Was Upgraded in the 1990s. Selected Upgrades Have Been Completed Since the 1990s With the Headworks and Primary Clarifier Project Completed in 2021. Much of the Facility Has Exceeded Its Useful Lifespan and Needs Replacement. The City Received an Updated Npdes Permit Allowing for an Increase in Design Flow Rate From 1.2 Million Gallons Per Day to 1.77 Million Gallons Per Day. This Increase in Flow Was to Accommodate a Request From Lonza Biologics for Potential Expansion of Their Manufacturing Capacity. In February 2023, the City Was Notified That the Request for an Increase in Flow Was No Longer Required Due to Water Conservation Upgrades and Manufacturing Process Changes Completed by Lonza Biologics. Since No Additional Flow is Required to Accommodate Lonza's Expansion Needs, the City is Changing Its Project Scope to Only Include Critical Refurbishment of Existing Equipment. Initial Engineering Design for the Necessary Upgrades is Underway. Funding Under the Bond Category Represents the Costs to Design and Construct Replacement of Aged Equipment at the Existing Facility. Costs Are Preliminary and Will Be Refined as the Design Moves Forward. The City is Working to Fund This Project Using Revolving Loan Funds (Srf) to Take Advantage of Principal Forgiveness, Lower Interest Rates and Favorable Construction Financing As of December 11, 2024, this project is included in the Portsmouth School Department Fiscal Year 2025-2030 CIP. Further information regarding a design firm and timeline for construction has not yet been established. Funding is allotted for FY 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$25,000,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
210
Active Projects
107
Bidding Soon
2,078
All Active Projects
850
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

img_map_placeholder

Multiple Locations, Portsmouth, NH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.