Renovation of a water / sewer project in Portsmouth, New Hampshire. Conceptual plans call for the renovation of a water / sewer project.
Update: https://www.cityofportsmouth.com/sites/default/files/2024-06/CIP-FY25-FY30.FINAL_.FY25.CIP_.Entire%20Document.24.06.27.pdf The Pease Treatment Facility Was Original Constructed in the 1950s and Was Upgraded in the 1990s. Selected Upgrades Have Been Completed Since the 1990s With the Headworks and Primary Clarifier Project Completed in 2021. Much of the Facility Has Exceeded Its Useful Lifespan and Needs Replacement. The City Received an Updated Npdes Permit Allowing for an Increase in Design Flow Rate From 1.2 Million Gallons Per Day to 1.77 Million Gallons Per Day. This Increase in Flow Was to Accommodate a Request From Lonza Biologics for Potential Expansion of Their Manufacturing Capacity. In February 2023, the City Was Notified That the Request for an Increase in Flow Was No Longer Required Due to Water Conservation Upgrades and Manufacturing Process Changes Completed by Lonza Biologics. Since No Additional Flow is Required to Accommodate Lonza's Expansion Needs, the City is Changing Its Project Scope to Only Include Critical Refurbishment of Existing Equipment. Initial Engineering Design for the Necessary Upgrades is Underway. Funding Under the Bond Category Represents the Costs to Design and Construct Replacement of Aged Equipment at the Existing Facility. Costs Are Preliminary and Will Be Refined as the Design Moves Forward. The City is Working to Fund This Project Using Revolving Loan Funds (Srf) to Take Advantage of Principal Forgiveness, Lower Interest Rates and Favorable Construction Financing Project is included Portsmouth School Department Fiscal Year 2025-2030 Page No 169 ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The Pease Treatment Facility Was Original Constructed in the 1950's and Was Upgraded in the 1990's. Selected Upgrades Have Been Completed Since the 1990's With the Headworks and Primary Clarifier Project Completed in 2021, but Much of the Facility Has Exceeded Its Useful Lifespan And is in Need of Replacement. The City is Also Planning for a Potential Increase In Design Flow Rate From 1.2 Million Gallons Per Day to 1.77 Million Gallons Per Day. This Increase in Flow Rate at the Treatment Facility Will Support the Build Out of the Pease International Tradeport and Provide Capacity at the Treatment Facility for Tradeport Tenants Including Lonza Biologics' Proposed Expansion. Planning for This Upgrade Has Begun but Full Design and Construction Will Not Take Place Until the Details of an Updated Permit Are Provided by the Epa. The Costs and Timing of This Work is Dependent Upon the Issuance of That Permit and Future Policy Decisions Regarding Cost Apportionment. Cost Provided in the Previous Fy22 Element Sheet Was a Placeholder and Have Been Updated Based on Similar Projects of This Size, Scope and Recent Cost Increases. Funding Under the Bond Category Represent The Costs to Design and Construct Replacement for Aged Equipment and Other Upgrades for the Existing Facility. Funding Under the Ppp Category Represent Costs for an Increase in Capacity. Costs Are Conceptual and Will Be Refined as Studies and Design Moves Forward. Updated Information Will Be Presented to City Council Before Any Decisions Are Made. FY-2023-2028 *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$25,000,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
March 2, 2026
Multiple Locations, Portsmouth, NH
Related To This Project
Portsmouth, NH
Bid Date: Jul 24 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--