Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 13, 2023 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Forest City, Missouri. Contact the soliciting agency for additional information.

The project consists of the purchase, supply, delivery, and off-loading the complete and operational pump replacement units as specified herein. The pump replacement units includes the following: Two (2) one stage vertical turbine propeller axial flow pump assemblies and hardware as outlined in Section 112130. From Forest City, take Holt County Road 290 West for 2.5 miles to the area.

Post-Bid

Water / Sewer

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
76
Bidding Soon
1,113
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 10, 2023

September 11, 2023

Project location map

Holt 290, Forest City, MO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed