Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Savannah, Georgia. Completed plans call for site work for a water / sewer project.
The work to be done consists of the following generally described items: Consists of drainage structure upgrades with this Casey South drainage Basin. Construction will include the addition and size upgrade of pipe and other drainage structures. This construction also consist of roadway demolition, repair and improvements, and detours. Casey Canal Improvements Phase 2A The work to be done consists of the following generally described items: The proposed project is in the residential area located in the vicinity of 54th, 56th and 57th streets between Abercorn to Harmon streets. It will consist of demolition of the existing streets, construction of new stormwater pipes, manholes and inlets, replacement of 8000 ft existing water mains plus laterals and associated valves/accessories, implementation of erosion control, sampling and reporting during construction and restoration of street pavement. The bids are set up in two phases and five options. (Please see attached exhibit) Phase 2-1: construction along 54th street from Abercorn to Harmon and along Abercorn St. from 55th to 54th Phase 2-1, alternative #1: Micro-tunnel 60" RCP for the most eastern block on 54th between Paulsen to Harmon. Phase 2-2: Construction along 57th from Abercorn to Reynolds, along 56th from Reyolds to Harmon, along Abercorn, Habersham, and Battey from 58th to 57 th and along Reynolds from 58th to 56th. Phase 2-2, alternative #1: use 10x6 box culvert in lieu of double 72" RCP for stormwater pipes. Phase 2-2, alternative #2: micro-tunnel 102" RCP for the most eastern block on 56th street between Paulsen to Harmon.
Bid Results
Water / Sewer
$50,921,464.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Find better bids. Win.
The best source for commercial construction data, period. Get instant access to up to five free projects and companies. Subscribe all contacts, documents, and details so that you can find new opportunities and win new business.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
November 14, 2023
December 14, 2023
April 23, 2024
Multiple Locations, Savannah, GA
Related To This Project
Savannah, GA
Bid Date: Aug 22 2023
Savannah, GA
Bid Date: Aug 24 2023
Savannah, GA
Bid Date: Aug 18 2023
Savannah, GA
Bid Date: Aug 18 2023
Savannah, GA
Bid Date: Aug 08 2023
Widening and Reconstruction to Construct a Four-lane Hwy on US 80/I-516 (Brampton Rd Conn) - 3973773
Savannah, GA
Bid Date: Jan 21 2022
Savannah, GA
Bid Date: Apr 20 2021
Savannah, GA
Bid Date: Aug 08 2023
Savannah, GA
Bid Date: Aug 08 2023
Savannah, GA
Bid Date: Nov 09 2021
Savannah, GA
Bid Date: Jul 27 2023
Savannah, GA
Bid Date: Jun 29 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--