Site work for a civil project in Lawton, Oklahoma. Completed plans call for site work for a water / sewer project.
DWSRF negotiated DBE participation goals with EPA of 11.25% for MBEs and 7.41% for WBEs. The DBE goals are not a quota Work consists of drilling 600' deep waterwell with 8" casing including submersible pump and appurtenances. Also included is plugging existing well. All bids received at said time shall be publicly opened and read aloud. All work shall be performed and all construction and material used and furnished shall be in accordance with the Plans and Specifications prepared by Jung Engineering , and on file in the office of the Fletcher PWA The Notice to Bidders, Form of Bid, Form of Contract, Plans and Specifications, Forms of Bid Bond, Performance and Statutory Payment Bond, and other Contract Documents may be examined at the following: 1. Fletcher PWA 423 W. Cole Avenue P.O. Box 448 Fletcher, OK 73547 2. Jung Engineering 3 NW Eagle Road Lawton, OK 73507 Each bidder shall accompany his original bid, with a certified or Cashier's Check on a solvent bank located in Oklahoma or a Bidder's Bond, in the amount of five (5) percent of the amount bid, as a guarantee of his ability to perform the contract bid upon, and that he will enter into a written contract with the Owner to perform said work and/or furnish said materials in accordance with said plans and specifications and furnish the required bonds within ten (10) days after the acceptance of his bid. The deposit will be retained by the Owner as, and for, liquidated damages in case the successful bidder fails to enter in said contract and furnish the required bonds provided for in the specifications within the time required. Deposit of the unsuccessful bidders will be returned upon the execution of the Contract and required bonds. Each bidder shall accompany his bid with a DW-412 Noncollusion Affidavit and a DW-413 Business Relationships Affidavit in writing displaying that the Bidder has not directly or indirectly entered into an agreement, express of implied, with any other bidder or the price or amount of such bid or any bids, the limiting of the bids or bidders, the paying to anyone any money for promotion expenses, the parceling or farming out to any bidder or bidders or other persons of any part of the contract or any part of the subject matter of the bid or of the profits thereof. Performance, Maintenance and Statutory Payment Bonds in the amount of 100% of the contract price with a Corporate Surety licensed in Oklahoma and approved by the Owner and Engineer, will be required for the faithful performance of the contract. A Maintenance Bond guaranteeing the repair of all damage due to improper materials or workmanship for a period of one (1) year, after the acceptance of the work by the Owner, will be required. This project is to be financed by a loan from the Oklahoma Water Resources Board through the Department of Environmental Quality Drinking Water State Revolving Fund (DWSRF) and shall be referred to as DWSRF Project No. P40-2001612-01. A. "Equal Opportunity in Employment: All qualified applicants will receive considerations for employment without regard to race, color, religion, sex, national origin, age or physical handicap. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in the specifications." B. "Each bidder must fully comply with the requirement, terms and conditions of the Department of Environmental Quality Small, Minority, Women's Businesses Requirements including affirmative steps to contract with small, minority and women's businesses during the performance of this contract. The bidder commits itself to the affirmative steps to contract with small, minority and women's businesses contained herein and all other requirements, terms and conditions of these bid conditions by submitting a properly signed bid. Requirements are contained in DEQ Guidance and Procedures, DW-700." C. "All bidders must comply with the Anti-Kickback Act and the Contract Work Hours Standards Act." D. "Davis Bacon Act wage rules shall apply. All laborers and mechanics employed by contractors and sub- contractors on projects funded directly by or assisted in whole or in part by and through the Federal Government shall be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by the Secretary of Labor in accordance with subchapter IV of Chapter 31 of Title 40, United States Code. The Department of Labor provides all pertinent information related to compliance with labor standards, including prevailing wage rates and instructions for reporting. For more information please refer." F. American Iron and Steel provisions also apply to projects funded directly by or assisted in whole or in part by and through the Federal Government pursuant to the "Consolidated Appropriations Act, 2014". Sec. 436(a)(1) of the act states that "None of the funds made available by a State Water Pollution Control Revolving Fund as authorized by Title VI of the Federal Water Pollution Control Act (33 U.S.C 1381 et seq.) or made available by a Drinking Water Treatment Revolving Loan Fund as authorized by Section 1452 of the Safe Drinking Water Act (42 U.S.C. 300j-12) shall be used for a project for the construction, alteration, maintenance, or repair of a public water system or treatment works unless all of the iron and steel products used in the project are produced in the United States." G. This project is subject to Build America, Buy America (BABA) Act requirements. The BABA Act requires none of the funds made available for a Federal financial assistance program for infrastructure, including each deficient program, may be obligated for a project unless all of the iron, steel, manufactured products, and construction materials used in the project are produced in the United States. The BABA Act requirement does not supersede the AIS requirement, and both provisions shall apply and work in conjunction. H. System for Award Management (SAM) registration is required for all DWSRF program applicants and Awardees (Entities, prime contractors, subcontractors, vendors) in order to be awarded contracts by the DWSRF program. SAM replaces Central Contractor Registration/Federal Agency Registration, Online Representations and Certifications Application, and Excluded Parties List System. Applicants and awardees are required to complete a one-time free registration to provide basic information relevant to procurement and financial transactions. New Applicants and awardees please go to Sam.gov to complete the registration process. Note: In order to register in SAM, a Data Universal Number System (DUNS) number will be required. DUNS number is a unique, non-indicative 9-digit identifier issued and maintained by Dun & Bradstreet (D&B) that verifies the existence of a business entity globally. D&B assigns DUNS numbers for each physical location of a business. All entities doing business with the U.S. Government can receive a DUNS number FREE of charge and, under normal circumstances, within 1-2 business days when using the D&B web form process at http://fedgov.dnb.com/webform The bids filed with the Fletcher PWA will be considered by the Fletcher PWA, at a meeting to be held at 423 W. Cole Avenue, Fletcher, Oklahoma at 6:30 pm Local on the 8th day of August, 2023 but all bids shall remain on file at least forty-eight (48) hours thereafter before a contract will be made and entered into thereon. Bids received more than ninety-six (96) hours prior to the Bid Opening will be returned. A pre-bid conference will not be held on this project. However, any prospective bidder may visit the project site and/or request additional information from Mr. Alvin R. Jung, P.E., Jung Engineering, 3 NW Eagle Road, Lawton, OK 73507, (580)361-8675, ajungpe@gmail.com prior to the bid opening. The contract is to be awarded to the lowest responsive, responsible bidder. The responsible bidder. The Owner reserves the right to waive any informalities in the bidding and the right to reject any and all bids in accordance with the Oklahoma Competitive Bidding Act. Conditional bids shall not be accepted
Award
Water / Sewer
$1,173,271.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 1, 2023
August 31, 2023
To Be Determined, Lawton, OK
Related To This Project
Lawton, OK
Bid Date: Aug 02 2023
Lawton, OK
Bid Date: Feb 08 2024
Lawton, OK
Bid Date: Mar 16 2021
Lawton, OK
Bid Date: Aug 02 2023
Lawton, OK
Bid Date: Aug 22 2023
Lawton, OK
Bid Date: Aug 31 2023
Lawton, OK
Bid Date: Oct 03 2023
Lawton, OK
Bid Date: Sep 12 2023
Lawton, OK
Bid Date: Jul 25 2023
Lawton, OK
Bid Date: Jun 30 2023
Lawton, OK
Bid Date: Jun 30 2023
Lawton, OK
Bid Date: Jul 11 2023
Lawton, OK
Bid Date: Jun 13 2023
Lawton, OK
Bid Date: Jun 13 2024
Lawton, OK
Bid Date: Jun 09 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.