Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, renovation and addition to an elderly care / assisted living facility in Pocatello, Idaho. Working plans call for the addition of a elderly care / assisted living facility; for the demolition of a elderly care / assisted living facility; for the renovation of a elderly care / assisted living facility; and for site work for a elderly care / assisted living facility.
The owner has selected a Construction Manager. The scope of this project includes a multi-phased renovation and expansion of the current 66 skilled nursing rooms (double occupancy) into private resident rooms with private bathrooms. Due to cost constraints some of the double occupancy rooms may remain and only a refresh completed in those spaces. It should also be noted that the existing two boilers are being replaced with three boilers and the existing water chiller is being relocated and replaced with a new air chiller as part of a separate project. Both are being sized to accommodate the expansion project. Project consists for furnishing Construction Manager/General Contractor (CMGC) services to the State of Idaho. Federal Funds will be associated with this project. This project will be required to comply with the provisions of the Davis Bacon act and Davis Bacon, the Copeland Act, and the Contract Work Hours and Safety Act regarding labor standards for federally-assisted construction sub agreements. This project will also likely be subject to Build America Buy America Act Submittals Oral Interviews (location TBD): August 23, 2023 (morning) A total project budget has been established at $42,295,000 and includes fees (A/E and CM/GC),commissioning services, contingencies, tests, and other project related expenses. The construction budget has been set at $34,206,000. Construction start date is dependent on receiving a federal grant with the earliest plausible grant Opportunity allowing for a schedule to commence on or about Spring 2025 and completion December 2027. Construction is contingent on the federal grant being awarded. The contents of the submittal may be used in a legal contract or agreement. Proposers should be aware that methods and procedures proposed could become contractual obligations. The State reserves the right to reject any or all proposals received as a result of this request. All questions must be sent to the DPW Project Manager Nicole Cecil, Project Manager Division ofPublic Works 502 N. 4th St. PO Box 83720 Boise ID 83720-0072 (208)332-1905 nicole.cecil@adm.idaho.gov The generator is likely going to be replaced as a separate project but is pending funding at this time. The home-like units/households will share multiple dining, living, patio, den/day spaces and exterior courtyards. Other amenities may include a canteen/bistro, theater, therapy, pharmacy, and administration support spaces. The existing resident rooms and common food preparation area, laundry facility, maintenance, supply areas and parking may also be remodeled. The phased construction of the home will allow the Veterans to continue living in their home during the expansion. Reference the attached 22603 Feasibility Study exhibit dated January 21, 2022.
Pre-Construction/Negotiated
Elderly Care / Assisted Living
$42,295,000.00
Public - State/Provincial
Addition, Demolition, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 2, 2023
March 20, 2025
1957 Alvin Ricken Dr, Pocatello, ID
Related To This Project
Pocatello, ID
Bid Date: Aug 08 2023
Pocatello, ID
Bid Date: Aug 14 2023
Pocatello, ID
Bid Date: Sep 07 2023
Pocatello, ID
Bid Date: Aug 25 2023
Pocatello, ID
Bid Date: Sep 11 2023
Pocatello, ID
--
Pocatello, ID
Bid Date: Sep 07 2023
Pocatello, ID
Bid Date: Sep 13 2023
Pocatello, ID
Bid Date: Aug 17 2023
Pocatello, ID
Bid Date: Aug 24 2023
Pocatello, ID
Bid Date: Jul 20 2023
Pocatello, ID
Bid Date: Jul 27 2023
Pocatello, ID
Bid Date: Jul 06 2023
Pocatello, ID
Bid Date: Jun 28 2023
Pocatello, ID
Bid Date: Jun 23 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.