BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Tallahassee, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and playground / park / athletic field.

Leon County is seeking the services of a qualified contractor for the construction of the St. Mark's Headwater Greenway - Phase II Project. The proposed project consists of Paved passenger parking area, natural surface overflow parking, three 12x12 pavilions, one 20x28 large pavilion, informational kiosks, ev car charging stations, restroom building, landscaping, stormwater facility, 6 miles of 12' nature trail, 600' of elevated boardwalk and playground. This project will require the use of a crane. The Contractor or sub-contractor must be prequalified by the Florida Department of Transportation (FDOT) for the work they are performing. The FDOT Prequalification Work Classes for this Project are Drainage, Electrical Work, Fencing, Flexible Paving, Grading, Landscaping, Minor Bridge, Pavement Markings, Roadway Signage, Sidewalk. Other Work Classes: Curbs, Driveways, Pile Driving, Rubble Riprap, Tree Removal, Tree Trimming, Underground Utilities (Water & Sewer), Underground Utilities (Electrical) & Utility Work. Prequalification documentation will be required prior to agreement execution. The proposed St. Marks Headwater Greenway - Phase II, Buck Lake Road Trailhead project is located in Section 26, Township 1 North, Range 2 East, in Leon County, Florida. The project limits are within the St. Marks Headwater Greenway located in the southwest quadrant of the intersection of Baum Road and Buck Lake Road as indicated in the construction plans. The scope of work to be performed under this bid will include construction of a paved access driveway, paved parking, pavilions with foundations, kiosk, pre-manufactured bathroom, electric vehicle charging station, underground electric, septic system, playground equipment installation, boardwalks, pre-manufactured bridge span, stormwater facilities, fencing, landscaping, irrigation, water line installation, trail clearing & grubbing and all associated improvements as shown on the construction plans. The project is anticipated to take 300 consecutive days. Question Submission Deadline August 1, 2023, 4:00 pm Bids shall be accompanied by a 5% bid guarantee which shall be a Bid Bond, Certified or Cashier's Check or Bank Draft (no cash, company, or personal checks will be accepted), made payable to the Board of County Commissioners, Leon County, Florida. Such check, bank draft, or bond shall be submitted with the understanding that the bonds will be held until award of bid. The County reserves the right to hold the Bid Guarantee until after a contract has been entered into or a purchase order has been executed. The accepted Bidders bid bond will be held until execution of the agreement and may be forfeited due to non- performance. The check or bond shall be submitted with the understanding that it shall guarantee that the Bidder will not withdraw his bid for a period of 90 days after the scheduled closing time for the receipt of bids. It shall also guarantee that the successful bidder will enter into a contract within ten (10) days after he has received notice of acceptance of his bid. In the event of withdrawal of bid, or failure to enter into and fully execute the contract within ten (10) days the contractor may be deemed in to be in default. In such an event, the contractor shall be liable to the County for the full amount of the default. A Combination Payment and Performance Bond in the amount of 100% of the estimated project cost shall be supplied by the Contractor at the time of Agreement execution. The County reserves the right to reject all bids when such rejection is in the best interest of the County. As of July 17, 2023, the approximate budget for this project is a 3.28 Million.

Award

Roads / Highways

$3,416,872.00

Public - County

Paving, Site Work

144

10

2

6

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
20
Bidding Soon
347
All Active Projects
148
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 10, 2023

October 9, 2023

img_map_placeholder

Baum Rd & Buck Lake Rd, Tallahassee, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.