BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of an educational facility in San Diego, California. Completed plans call for the renovation of a educational facility.

On behalf of the San Diego Unified School District, Balfour Beatty Construction, LLC is requesting bids from qualified subcontractors (licensed contractor with A or B Classification(s) or C Specialty license for scope noted within the Bid Packages) for: Spreckels Elementary School Reroofing of 5 Buildings **DO NOT CONTACT Schoool District / SDUSD.** Bid Package No. BP01 Remove and Replace Roofing: License required: B, C-21, C-22, C-39, C-43 Pursuant to resolution in support of Service Disabled Veterans Owned Businesses (SDVOB) and Disabled Veteran Business Enterprises (DVBE) approved on May 10, 2011 by the Board of Education, Balfour Beatty Construction, LLC., is required to satisfy a minimum DVBE participation percentage of at least three percent (3%) for this project. In compliance with this program, the bidder shall satisfy all requirements enumerated in the bid package. GOALS FOR EBE & DVBE PARTICIPATION: 50% EBE / 3% DVBE. Prequalifications are due to the District by July 21, 2023. Every subcontractor to the Contractor seeking to perform work on this bid, regardless of trade, tier, or value of the work, is required to be prequalified with the District. Bids will not be accepted from non-prequalified subcontractors. Email prequal@sandi.net for more information. MEP (Mechanical/Electrical/Plumbing): Subcontractors performing work under one or more of the following license classifications, including any contractor holding A or B licenses and/or performing work of C-4, C-7, C-10, C-16, C-20, C34, C-36, C-38, C-42, C-43 and C-46, should submit their prequalification application MEP prequalifications must be renewed annually on the approval anniversary. NON-MEP: Each Non-MEP contractor should submit a Non-MEP subcontractor prequalification application Electronically. Non-MEP prequalifications must be renewed annually every February Balfour Beatty Construction, LLC PREQUALIFICATION: ALL BIDDERS must be prequalified to BID on Balfour Beatty Construction Projects for any BID in excess of $500,000. If the Bid Package amount is over $500,000, then the Bidder must submit a prequalification package and be approved prior to any award. Approvals are good for 12 months and must be renewed annually For subcontracts exceeding $100,000, a Performance and Payment Bond will be required. The Bonds must be executed by an admitted Surety approved to conduct business in the State of California, which meets the highest standards the District is legally permitted to establish and which it has established. For subcontracts of $25,000 that do not exceed $100,000, a Personal Guarantee signed and notarized by an authorized representative awarded the subcontract will be requested instead of bonds. This project is being bid as Bid Packages per contract number. The bidder must self-perform a minimum of 15% of each bid package that is being bid. If a bidder is interested in bidding multiple bid packages, the bidder must submit individual bids for each bid package per GMP. Bidders may demonstrate economy of scale savings on their proposal forms by bidding multiple bid packages for a single GMP. However, bidders may NOT combine multiple bid packages for multiple GMPs, into a single GMP submission. All bids will be reviewed and evaluated for completeness of scope coverage. Subcontracts shall be awarded, if awarded at all, by the general contractor on the basis of lowest bid. The District defines lowest bid as the lowest responsive, responsible bid for a single bid package or the summation of the lowest value of multiple bid packages, if multiple bid packages were proposed by a subcontractor. If DVBE mandatory participation is needed, the next lowest subcontractor who can meet the minimum 3% DVBE requirement may be selected. . It is required that bidders possess any of the following classification(s) of California State Contractors License(s) (or other appropriate license, subject to District approval), valid and in good standing, at the time of bid opening and contract award Prevailing wage requirements apply to all public works projects and must be followed per Article 17 of the General Conditions of the Request for Proposals. The applicable prevailing wage determination during construction is the one in effect on the date the GMP is first published in a newspaper of general circulation. Here, the applicable prevailing wage determination for construction services referenced in the published GMP advertisement is 2023-1. The first bid advertisement date for each District defined GMP phase shall establish the applicable prevailing wage determination, regardless of how many times the Prime Contractor published an advertisement. That first bid advertisement to subcontractors shall state the applicable prevailing wage determination for construction services for the duration of that District defined GMP phase. Each District defined GMP phase for construction services may have a different prevailing wage determination based on its separate publication of the first bid advertisement date PROJECT CONTACT: Maita Santos, Asst. Project Manager at (858) 226-5878, MSantos@balfourbeattyus.com Estimated Bid Value:$1.4 M - 1.5 M The scope of work is removal and replacement of roofing of 5 Buildings. Start/Delivery Date: October 11, 2023 Project Duration:10 months Submit RFIs electronically no later than July 25, 2023, at noon. Final addendum including RFI responses will be issued on August 7, 2023. BP01 :Remove and Replace Roofing : B, C-21, C-22, C-39, C-43 The District reserves the right to reject any and all bids and to waive any irregularities or informalities in any bids or in the bidding process. No bidder may withdraw his bid for a period of 90 days after the date set for the opening of bids. Authorized under Education Code 17406, LLB is a common delivery method used by approximately 89 school districts in California, including 15 school districts within San Diego County. Effective January 1, 2017, Lease-Leaseback is to be used via a competitive selection process for best value award (in contrast to the regular design-bid-build, which requires award to the lowest bidder). *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Educational

$1,500,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
45
Bidding Soon
1,138
All Active Projects
512
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 10, 2023

October 11, 2023

img_map_placeholder

6033 Stadium St, San Diego, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.