BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Ashland, Massachusetts. Completed plans call for site work for a playground / park / athletic field.

Fabricating and installing a platform Mill Pond Park Mill Pond Viewing Platform and Railings Question Deadline 08/02/2023 at 4:00 PM ET Deadline for Written Questions jball@ashlandmass.com By Mail: Jenn Ball, Assistant Town Manager, 101 Main Street, Ashland, MA 01721. , provide the of installation of decking on top ofthe new structural steel and wood platform, installing fencing at Mill Pond Ashland, MA. This is the second and final phase ofthis project which consists ofinstalling decking on top of the new structural steel and wood platform, installing fencing along the front (at the pond side) and identical fencing on top ofthe concrete barrier to the right ofthe sluiceway by the waterfall ofthe pond. The decking shall be an azek or similar product and match in color and style the decking on the bridges around Mill Pond. Approximately alOftxllft area, the contractor is responsible for all measurements. The fencing shall match exactly the existing fencing/guards that is already installed on the bridges. The existing chain link fencing is to be removed and the new fencing shall be installed in its place, approximately 32 ft. The contractor is responsible for all measurements. The following products were some ofthe materials used to make the fencing/guards. l/2"x 1" black steel balusters 4x4 PT lumber (posts) 2x4 PT lumber 3-1/2" x 1-1/2" PVC, match existing 5-1/2" x 1-1/2" PVC, match existing 3" brown trim screws 2.5" brown trim screws. 3" wood screws (exterior use) Vi' x 8" anchor bolts 1-1/2" wood screws (exterior use) Metal brace posts (2 parts to attach to the concrete) for the posts. See photo The PVC are odd sizes; they were ordered originally by the Town through Lowes. The existing posts are set approximately 87" on center. This may or may not be a complete list, the winning contractor is responsible to order the material and match the existing guards, fencing exactly

Bid Results

Playgrounds / Parks / Athletic Fields

$20,743.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
422
Active Projects
228
Bidding Soon
3,119
All Active Projects
1,403
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 10, 2023

September 11, 2023

img_map_placeholder

2 Myrtle St, Ashland, MA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.