BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling and renovation of an educational facility in Middletown, Connecticut. Completed plans call for the expansion of a post-secondary education facility.

As of September 5, 2023, this project has not yet been awarded. A timeline or award has not yet been established. Bid Title was changed from 'ADA Vestibule Upgrades Snow & Wheaton Halls ManchesterCommunity College' to 'ADA Vestibule Upgrades Snow & Wheaton Halls Middlesex Community College' The work of this contract includes, but is not limited to the following: The Construction Work is a single Lump Sum Base Bid. This project addresses ADA compliance issues at the main entry vestibules of Snow and Wheaton Halls on the Middlesex Community College Campus at 100 Training Hill Road in Middletown, Connecticut. The Construction Work includes the addition of a new exterior canopy at each entry and interior renovations to each hall's entry vestibule and security lobby. Exterior improvements at Snow and Wheaton Hall include the construction of a new cantilevered entry canopy over the existing main entrance to each building, Installation of new exterior signage, emergency lighting for egress and infrastructure for a future card access system. Minor repair of the existing concrete thresholds and bituminous walkways leading to the entries is included as well. Interior improvements at Snow and Wheaton Halls include selective demolition of the existing exterior and interior entry doors, floor finishes within the vestibule, and the existing suspended acoustical ceiling pads and lights within the vestibules and security lobbies. Construction includes installation of new interior and exterior entry doors, floor finishes and wall paint, and installation of new suspended acoustical ceiling pads and LED lighting. Performance and Payments Bonds shall be furnished by the successful bidder awarded the contract in an amount of 100% of the Contract Sum. This project is therefore subject to the state set-aside goals of 25% SBE and 6.25% MBE on the entire state contract amount complete the entire project within 120 consecutive calendar days after commencement of work.

Award

Educational

$296,000.00

Public - State/Provincial

Remodeling, Renovation

17

18

2

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
511
Active Projects
264
Bidding Soon
4,389
All Active Projects
2,070
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 10, 2023

September 25, 2023

img_map_placeholder

100 Training Hill Rd, Middletown, CT


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.