BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Bolton, Massachusetts. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of August 22, 2023, project was awarded to Sunshine Paving awarded amount is $521,633.041. Road Resurfacing & Reconstruction: Hot Bituminous Paving - Laid in Place; Roadway Milling and Reconstruction. Road resurfacing and reclamation of town roadways Questions regarding these specifications should be directed to Randall Heglin, Director of Public Works 978-779-6402 dpwdirector@townofbolton.com It is preferred that all questions be submitted in writing. Interpretations or clarifications deemed necessary by the Town in response to such questions will be issued in the form of written addenda, mailed to all parties recorded by the Town as having received the Bid documents. The issuance of a written addendum by the Town shall be the only official method whereby such an interpretation or clarification will be made. Concerns about the process should be directed to the Chief Procurement Officer (Town Administrator) All questions and requests for clarification shall be made at least 7 calendar days prior to the bid opening Project Requirements - Scope of Work Respondents to this bid request must be aware of these and the following qualifications and reflect them in their pricing quotations. A. General Scope of Work The work covered by these specifications consists of the furnishing of materials labor, equipment, for the installation of bituminous concrete and other asphalt products used in pavement overlays, patching, and repairs. Methods shall be as specified by the MADOT Standard Specifications for Highways and Bridges, latest edition. B. Materials and Equipment Materials and equipment shall be as specified by the MADOT Standard Specifications for Highways and Bridges, appropriate sections, latest edition. Any asphalt delivered to the spreader having a temperature lower than 250oF nor higher than 325 oF shall not be used. Contractor shall have thermometer onsite if conditions warrant testing of delivered material. Equipment used in the performance of the work required by these specifications shall be maintained in satisfactory working conditions at all times. Compaction: The initial rolling shall be done with a static steel-wheeled roller. Final rolling shall be done with a roller of the steel wheel type or pneumatic tired roller. The minimum weight if the static steel-wheel roller shall be 8 tons. In areas where the large static roller cannot be used, a smaller static roller 3 to 5 ton roller will be used such as under mailboxes, driveways, islands or tight radii along the curbing. Tack coat shall be used between pavement courses, overlay of existing or cold planed pavement. Tack Coat 1. Emulsified type, Grade RS-1, CRS-1, HSMS-1, CSS-1,1h 2. Distribution rate - 0.05 to 0.08 gallons/Square yard

Award

Roads / Highways

$521,663.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
633
Active Projects
385
Bidding Soon
5,133
All Active Projects
2,137
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 8, 2023

October 9, 2023

June 30, 2024

img_map_placeholder

Multiple Locations, Bolton, MA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.