BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 15, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Covington, Kentucky. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of Aug 14, 2023 the project has not yet been awarded. A timeline for award has not yet been established . CONTRACTOR shall provide all labor, materials, equipment and incidentals as shown, specified or required to furnish and install hot mix-hot laid bituminous paving Each bidder must deposit with his bids, security in the amount of ten (10%) percent in the form of bid bond or certified check Question Deadline 07/18/2023 at 11:00 AM ET Additional questions may be directed to the Citys Procurement Officer, Peter Hager at Peter.Hager@covingtonky.gov or 859-292-2178. The City Commission reserves the right to reject any and all bids, and waive any informalities The scope of work includes, but is not limited to, performing the following major items: 1. Signing streets "No Parking" 24 hours prior to beginning of construction. 2. Provide proposed work schedule to City Engineering staff 2 weeks prior to work beginning so City can provide advance notification to residents that will be impacted. 3. If schedule changes due to weather or other circumstances, "no parking" signs must be removed or updated with new dates immediately. 4. Milling existing surface to specified depth, according to the 2012 KYTC Standard Specifications for Road and Bridge Construction ("KYTC Standard Specifications") Section 408. 5. Sweeping street surface clear of dust and debris created by milling prior to resurfacing, according to Section 02512-3.2. 6. Milling adjacent to or adjusting manhole and valve box frames to final surface grade prior to resurfacing. To be incorporated with the milling process. Must coordinate with the appropriate utility company. 7. Resurfacing streets to the specified depth, according to KYTC Standard Specifications for Road and Bridge Construction Section 403. Refer to Section 409 for use of Reclaimed Asphalt Pavement. 8. Sealing joints with hot-poured sealant according to KYTC Standard Specifications Section 807. 9. Applying Line Striping for Centerline (double yellow line), Crosswalks and Stop Bars as shown on Bid Form, according to KYTC Standard Specifications for Road and Bridge Construction Section 713. 10.Maintenance and control of traffic on streets where CONTRACTOR is performing resurfacing work. CONTRACTOR shall communicate traffic maintenance and control plans to OWNER prior to beginning the Work. 11.Environmental controls including but not limited to erosion, dust control, cleaning of streets, and surface drainage. 12. Striping and crosswalks must be installed within 30 days of new asphalt being installed.

Bid Results

Roads / Highways

$927,540.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
266
Active Projects
174
Bidding Soon
2,401
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 27, 2023

August 28, 2023

Project location map

Multiple Locations, Covington, KY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.