BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 7, 2025 at 7:00 PM

Updated January 8, 2025

Demolition, site work, paving and new construction of a mixed-use development in Alcoa, Tennessee. Completed plans call for site work for a 1,200,000-square-foot parking garage; parking garage; for the demolition of a parking garage; and for paving for a 3,500-space parking garage.

As of January 7, 2025, bid package # 2 has been released and is listed separately. Construction on the initial project commenced in November 2024. The previous solicitation is listed below for reference. SCOPE OF WORK The scope of this project includes the construction of a 1,200,000 Square Foot 6-level cast-in-place parking structure. All work shall be performed in strict accordance with the Contract Documents. The work includes but is not limited to the following: The furnishing of all labor, materials, equipment, incidentals, and tools, and miscellaneous services required for the construction and completion of the Project; and submission of material submittals, forms, applications, equipment warranties/registration and other documents, as required by applicable regulatory authorities. General work elements for this project include: 1. WC01: Site Utilities, Roadways, Site Demo & Garage Building Pad 2. WC02: Deep Foundations 3. WC03: Site Concrete 4. WC04: Vertical Concrete Structure 5. WC05: Plumbing & HVAC (incl. TAB) 6. WC06: Electrical/Fire Alarm/Low Voltage CCTV 7. WC07: Drywall 8. WC08: Fire Protection 9. WC09: Masonry 10. WC10: Structural Steel & Misc. Metals 11. WC11: Parking Count Equipment 12. WC12: Doors/Frames/Hardware 13. WC13: Membrane Roofing 14. WC14: Canopies 15. WC15: Metal Panels 16. WC16: Aluminum and Glass 17. WC17: Acoustical Ceilings 18. WC18: Sealants, Waterproofing, Air Barriers 19. WC19: Painting 20. WC20: Accessories 21. WC21: Interior Wayfinding 22. WC22: Roadway Signage 23. WC23: Parking Control/Gates 24. WC24: Pavement Marking 25. WC25: Parking Garage Striping 26. WC26: Landscaping & Irrigation 27. WC27: Final Cleaning (incl pressure wash x2 or 3) 28. WC28: Flooring 29. WC29: Precast Stairs 30. WC30: Carpentry 31. WC31: Asphalt 32. WC32: Elevators The Metropolitan Knoxville Airport Authority, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 USC 2000d to 2000d-4) and the Regulations, hereby notifies all bidders or offerors that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Completion is expected in 2027.

Under Construction

Parking Garage

$190,000,000.00

Public - City

Demolition, New Construction, Paving, Site Work

6

5

2

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
0
Bidding Soon
504
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2024

November 12, 2024

Project location map

2055 Alcoa Hwy, Alcoa, TN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.