Published February 7, 2024 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Jefferson, Ohio. Completed plans call for site work for a water / sewer project.

As of August 31, 2023, the project has been awarded and construction is slated to commence in September, 2023, however, an exact timeline for construction has not been confirmed. WSRLA FUNDED PROJECT OPWC FUNDED PROJECT NO. CG 32Z/33Z OPINION OF PROBABLE CONSTRUCTION COST: $ 1,610,000.00 COMPLETION DATES: SUBSTANTIAL COMPLETION MARCH 31, 2024; SITE RESTORATION: MAY 10, 2024 All questions during bidding should be addressed to Georgia Conway, P.E., who can be reached at the CT Consultants, Inc., 8150 Sterling Court, Mentor, Ohio 44060 at 440-530-2304. All contractors and subcontractors involved with the project will to the extent practicable use Ohio products, materials, services, and labor in the implementation of their project. Additionally, contractor compliance with the equal employment opportunity requirements of Ohio Administrative Code Chapter 123 is required. The current negotiated goals for construction related activities are 1.3% of all contracts to MBEs and 1.0% of all contracts to WBEs.

Award

Water / Sewer

$1,151,656.00

Public - County

Site Work

3

13

10

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Temporary Facilities and Controls, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Execution, Application
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
89
Bidding Soon
978
All Active Projects
436
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 2, 2023

September 12, 2023

img_map_placeholder

Multiple Locations, Jefferson, OH

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

College Street and Route 307 Waterline Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.