BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work and addition to a municipal facility in Fort Worth, Texas. Working plans call for the addition of a 12,943-square-foot municipal facility; for the demolition of a municipal facility; and for site work for a municipal facility.

Selective demolition of existing West building facade and new construction to attach new 10-story elevator tower and connected exterior corridors from Lower Plaza Level 01A to Level 03. Site work to include new street corner radii with curb and gutter around the existing city block, new paving of Lamar Street with parking, planters, and landscaping. New structure is cased drilled concrete piers with concrete grade beams, structural steel framing, composite metal floor and roof decks Exterior finishes to match existing and include brick masonry veneer, cast stone panels, granite panels, decorative metal, aluminum windows, insulated and spandrel glazing, aluminum storefront entrances and framing, metal canopies, and 2-ply modified bitumen roofing. Interior finishes include hollow metal door frames, hollow metal and solid core wood doors, terrazzo flooring, carpet tile, gypsum board and metal stud wall and ceiling assemblies, acoustical panel ceilings, resilient base, large format wall tile, cast stone, paint, and solid surfacing. Facility services to include fire suppression, plumbing, heating, ventilation, air conditioning, electrical power, exterior and interior lighting, access control and security came. The source of funding for this Project is the Federal American Rescue Plan Act (ARPA) therefore it will utilize prevailing wage rate schedules of the United States Department of Labor adopted in accordance with the Davis-Bacon Act. Tarrant County reserves the right at its sole discretion to determine if presentations and interviews are in the best interest of the County. Tarrant County is under no obligation to request oral presentations. Question Deadline 02/12/2024 at 12:00 PM CT. Shortlist Confirmed

Final Planning

Municipal

$9,703,051.00

Public - Federal

Addition, Demolition, Site Work

160

28

2

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
62
Bidding Soon
3,510
All Active Projects
1,391
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.