BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Clay City, Illinois. Working plans call for site work for a water / sewer project.

As of October 11, 2023, All bids were rejected. Project will rebid but no definite date yet. As of September 19, 2023, this project has not yet been awarded. A timeline for award has not yet been established. As of September 6, 2023 project has not been awarded yet. A timeline for award has not yet been established. Bids are invited upon the several items and quantities of work as follows: Trenchless cured-in-place-pipe (CIPP) rehabilitation of 8" diameter sanitary sewer. The work includes sewer cleaning, CCTV sewer inspection, CIPP sewer lining, service connection grouting and ancillary items. A certified check or bank draft, payable to the order of Village of Clay City, negotiable U.S. Government bonds (at par value), or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to five percent (5%) of the total bid shall be submitted with each bid. Attention is called to the fact that not less than the minimum salaries and wages as set forth in the Contract documents must be paid on this project, and that the Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, or national origin. Bidders and any potential subcontractors must have a SAM Unique Entity ID assigned and a complete, active SAM registration [85 FR 49523, 25.205], and not be excluded from participating in any federal assistance program [24 CFR 85, Subpart C 85.35]. These items must be submitted with the bid. A Substance Abuse Policy shall be submitted before contract award. Bids may be held by the Village of Clay City for a period not to exceed 60 days from the date of the opening of bids for the purpose of reviewing the bids and investigating the qualifications of Bidders, prior to awarding of the Contract. The Village of Clay City reserves the right to reject any or all bids or to waive any informalities in the bidding. Custom Bid Results DIVISION 1 Visu-Sewer of Missouri, LLC - 567,270.00 DIVISION 2 Visu-Sewer of Missouri, LLC - 273,902.00

Final Planning

Water / Sewer

$841,172.00

Public - City

Site Work

5

6

6

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
20
Bidding Soon
389
All Active Projects
176
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 24, 2023

April 1, 2024

img_map_placeholder

Multiple Locations, Clay City, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.