Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 18, 2023 at 8:00 PM
Updated January 26, 2024
Renovation of an educational facility in Wyandanch, New York. Completed plans call for the renovation of a educational facility.
Each proposal submitted must be accompanied by a certified check or bid bond, made payable to the "WYANDANCH UNION FREE SCHOOL DISTRICT", in an amount equal to five percent (5%) of the total amount of the bid, as a commitment by the bidder that, if its bid is accepted, it will enter into a contract to perform the work and will execute such further security as may be required for the faithful performance of the contract. A. Furnish all labor, equipment, materials, tools, means, methods, and incidentals necessary to complete the Work as required by the Contract Documents for this Construction Contract. Each Contractor shall coordinate, through the Owner/Engineer, the work of their contract with the work by others. B. This following abbreviated summary is provided in order to briefly describe the work covered by the Contract Documents for this Construction Contract. It is not all inclusive of the work under the Contract. C. The work includes, but is not limited to, the following: 1. Main secondary feeders, power distribution, and instrumentation control wiring. Provide, mount, and install electrical conduit, wire, fittings, boxes, panels, and electrical accessories. 2. Motor control centers, local control stations, transfer switches, power distribution panels, breakers, lights, and switches. 3. Electrical connections (final termination) to all equipment, control panels, ventilating equipment and electrical devices. 4. Startup participation for the various equipment and systems of the project and provide complete service to troubleshoot and assist manufacturer service representatives in obtaining a completely functional installation. 5. Removal of existing components as noted. 6. New secondary feeders, power distribution, and instrumentation control wiring. New electrical conduit, wire, fittings, boxes, panels, and electrical accessories. 7. Final electrical terminations to all control panels, pumping equipment, blowers, HVAC equipment, etc. 8. Wiring connections to all electrical equipment (including equipment furnished by others). 9. Testing, programming and adjusting of all electrical systems. 10. Startup participation for the various equipment and systems of the project. Provide complete service to troubleshoot and assist manufacturer service representatives in obtaining a completely functional installation. Provide systems and equipment training for Owner personnel. 11. Project closeout submittals A. Furnish all labor, equipment, materials, tools, means, methods, and incidentals necessary to complete the Work as required by the Contract Documents for this Construction Contract. Each contractor shall coordinate, through the Owner/Engineer, the work of their contract with the work by others. B. This following abbreviated summary is provided in order to briefly describe the work covered by the Contract Documents for this Construction Contract. It is not all inclusive of the work under the Contract. C. The work includes, but is not limited to, the following: 1. Startup participation for the various equipment and systems of the project and provide complete service to troubleshoot and assist manufacturer service representatives in obtaining a completely functional installation. 2. New grilles, registers, duct work, supports and accessories. 3. Louvers and exterior wall openings. 4. New air conditioning systems. 5. New ventilation systems. 6. Equipment supports, dunnage, and structural alterations. 7. Ductwork, piping, valves, fittings, dampers, louvers, etc. 8. Roofing, penetration sealing, and weatherization. 9. Patching, painting, and finishing work. 10. Equipment controls and BMS integration. 11. Testing and balancing of systems. 12. Project closeout submittals. D. All other work shown and specified in the Contract Documents for Contract H.
Post-Bid
Educational
$60,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 28, 2023
August 28, 2023
140 Garden City Ave, Wyandanch, NY
Related To This Project
Wyandanch, NY
Bid Date: Jan 20 2022
Wyandanch, NY
Bid Date: Jan 20 2022
Wyandanch, NY
--
Wyandanch, NY
--
Wyandanch, NY
Bid Date: Feb 06 2025
Wyandanch, NY
Bid Date: Mar 13 2025
Wyandanch, NY
Bid Date: Jul 15 2025
Wyandanch, NY
Bid Date: Jan 05 2021
Reconstruction to Martin L. King Jr. Elementary / LaFrancis Hardiman School and Bus Garage - 4462665
Wyandanch, NY
Bid Date: Sep 23 2021
Wyandanch, NY
--
Wyandanch, NY
Bid Date: Jul 29 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
