BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Hammond, Indiana. Contact the soliciting agency for additional information.

Notice was incorrectly posted with a combined synopsis/solicitation.The requirement will be sent to local construction IDIQ contract holders first and the re-published via SAM.gov if no prospective awarded can be obtained through the IDIQ contractor list. The contractor shall perform a pre-alteration test and balance of the existing kitchen exhaust system. Provide a report with a list of deficiencies. The contractor shall perform cleaning of the kitchen exhaust system in compliance with NFPA standards. Observe the vertical ducts for any fluid that escapes the kitchen exhaust ductwork. Provide a report. Visit site to verify the documents reasonably reflect the actual conditions. The contractor shall verify that adequate physical space is available to perform work. Verify the removal and relocation of items necessary to complete work. Develop shop drawings and schedule trade efforts to accommodate the project. Remove the welded kitchen exhaust ductwork from the ceiling of the second floor. Remove any finishes, utilities, equipment, conduits to accommodate demolition and providing new reconfigured kitchen exhaust duct. Provide new kitchen exhaust duct with a reconfigures routing. Connect to the existing vertical black iron exhaust duct and existing kitchen exhaust hood. Provide access panels, supports, UL listed kitchen exhaust duct, etc. Perform leakage test, test and balance and any testing required by kitchen exhaust manufacturer. Submit reports. Re-install ceilings, utilities, equipment, ducts, conduits that were removed to accommodate efforts to demolish and replace kitchen exhaust duct. Relocate items conflicting with the new routing. Provide closeout documents consistent with the front-end specifications. The contractor shall perform efforts when the building is closed to the public. The bid shall reflect working at these times. The contractor shall cordon off the area of work to allow for the partial use of food prep spaces during construction. Provide temporary partitions, dust protection, access doors, etc.

Post-Bid

Military

Public - Federal

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
71
Bidding Soon
1,763
All Active Projects
776
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 11, 2023

September 11, 2023

img_map_placeholder

5400 Federal Plaza, Hammond, IN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.