BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 11, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of an office development in Salem, Oregon. Completed plans call for the renovation of a office development.

SAMTD is soliciting bids to provide services to clean, repair, and repaint the exterior stucco walls on our Del Webb Administrative building in Salem, Oregon. Requests for Question Deadline: August 8, 2023 4:00PM PDT Bidder may submit questions, request clarification, or request a change to the ITB by submitting a written request to Daniel Knauss, Procurement & Contracts Manager at the address set forth above in Section 3, 1.A.(4) or via email procurement@cherriots.org. The Successful Bidder shall be licensed by the State of Oregon to do the work and provide the systems required under this solicitation and resultant contract. All items or services to be furnished hereunder shall meet all applicable state and federal requirements of the Occupational Safety and Health Standards. Contractor shall obtain and maintain in current status all applicable permits and licenses. SAMTD is soliciting bids for a contractor to clean, repair, and repaint the exterior stucco walls on our Del Webb Administrative building. The building is approximately 9,453 square feet. The dimensions of this building are approximately 172' L x 81' W. The height of the area to be painted is 8' plus the pillars under the high awning as illustrated below. Note: SAMTD intends for the work to be completed within 30 days from an executed contract. Bidders should take this into consideration in their response. Description The bid shall include labor, materials, and services to perform the requirements below (Note - all product applications must following manufacturers recommendations and all safety precautions): 1. Preparation of the building for repair and painting. 2. All surfaces should be cleaned and any small defects or cracks filled. 3. Care should be taken to protect plants close to the areas to be painted. 4. From the images shown below, all stucco and downspouts that are beige in color shall be painted a similar beige color. 5. There are also a few small areas that will need siding repair prior to painting. Images of these areas are below. 6. Clean the exterior windows after repair and painting is completed. 7. Warranty: a. 4 year labor warranty b. 2 year product warranty

Award

Office

$38,423.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
2
Bidding Soon
638
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2023

September 8, 2023

Project location map

Multiple Locations, Salem, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.