BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a laboratory facility in Hilo, Hawaii. Completed plans call for the renovation of a laboratory facility.

The Smithsonian Institution is seeking offers to Construct and Install the PACU Replacement at the Submillimeter Array (SMA) Base Facility, at Smithsonian Astrophysical Observatory, Submillimeter Array Facility, Maunakea Science Reserve, Hawaii. The Smithsonian currently estimates that the fixed price for the entire project will be over $4M. The Period of for the Base Contract is 570 Calendar from the date of Notice to Proceed. PROJECT DESCRIPTION The Contractor shall furnish all supervision, labor, materials and equipment needed to complete the work at the Smithsonian Institution's Submillimeter Array Facility at the Maunakea Science Reserve, Hawaii, as forth on the Drawings for SF Project No: 1883701 sheets l through 63 and in these specifications, both dated March 2023. The Work includes, but is not to: Removal of existing HVAC equipment, including Air Conditioning Unit (PACU), outside air supply fans, space exhaust fans, ducts, ductless split systems, dampers, sensors, and controls Removal of existing electrical power supply for the above equipment, Removal of miscellaneous lighting fixtures Removal of existing clean agent fire suppression system, including cylinders, piping, and controls Removal of existing fire alarm equipment, including detectors, annunciators, and controls. Provision of: new custom factory fabricated Air Handling Unit (AHU); two new chillers with integral pumps and hydronic equipment; new VAV terminal units and motorized dampers, two new outside air supply fans with duct-mounted electric heating coils; one new direct expansion Fan Coil Unit (FCU); one new Variable Refrigerant Flow (VRF) system with four indoor units; one new and complete Direct Digital Control (DDC) system; new dampers and controls to integrate with the clean agent fire suppression system; revisions to existing ducts and equipment; and all material and appurtenances to support the aforementioned work New equipment and revisions to existing electrical equipment to provide electrical service to the above equipment New clean agent fire suppression system, including cylinders, piping, and controls New Fire Alarm (FA) system, including space-mounted smoke and heat detectors, air sampling smoke detectors, annunciators, and controllers Removal of existing and reinstallation of existing ceiling tiles and grid; patching of existing walls; painting of new exterior equipment; new structural steel supports; and other architectural and structural work in support of the above equipment. Critical Elements of the Work: The successful Contractor shall be fully qualified to install critical elements of the Work. Upon request of the Contracting Officer, s shall submit a statement of qualifications to address the following critical elements of the Work: Installation, connection and commissioning of proposed HVAC system. The facility will remain in operation for the of the project. Project shall include the provision of temporary HVAC for all spaces by using some new equipment in temporary locations and temporary relocation of some existing equipment. Cultural aspects of the dictate limits acceptable arrangement of exterior equipment. The indicated exterior equipment arrangement and locations shall be strictly adhered to. Facility shall have continuous electrical power throughout operation. Electrical power shutdowns to be to agreed upon durations. Installation of the new fire suppression system shall be phased. The control panel and detection systems shall be installed in their final location, as they don't conflict with the existing. Initially some of the new suppression cylinders shall be installed in a temporary location and system commissioned and tested, after which the existing system can be demolished. A second phase shall have the remainder of the cylinders and all of the piping installed. Cylinders that were temporarily installed elsewhere shall then be installed in the storge room. A final test shall be performed. During construction of the new FA alarm, the existing FA system shall remain in and operational to preserve life safety. The existing FA system shall not be demolished until the new FA system has been installed and provides sufficient coverage for life safety. PRE- The Pre-proposal is scheduled for Tuesday, August 15, 2023 at 9 AM Hawaii Standard Time. QUESTIONS/CLARIFICATIONS It is desired that all questions/clarifications be sent in, sequentially numbered for example first questions 1, 2, 3, second of questions 4, 5, 6, etc. in word format to ChanVC@si.edu. It is requested that all questions be sent in not later than August 18, 2023, at 5PM EST. PROPOSAL DUE DATE The Proposal Due Date is Thursday, August 31, 2023, at 5:00 PM Eastern Standard Time. *The for this project is based on a financial range. The is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Laboratories

$5,106,685.00

Public - Federal

Renovation

65

23

30

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
8
Bidding Soon
81
All Active Projects
35
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 31, 2023

October 30, 2023

May 22, 2025

img_map_placeholder

645 N Aohoku Pl, Hilo, HI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.