BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Cheltenham, Maryland. Completed plans call for the renovation of a military facility.

Contract Award Date: Aug 23, 2023 Contract Award Number: 70LGLY23PSSB00037 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: U58VYTNVJ4X6 Contractor Awarded Name: ADVANCE TELECOMMUNICATION IMPLEMENTATION SOLUTION LLC Contractor Awarded Address: Sterling, VA 20165 USA Base and All Options Value (Total Contract Value): $17,455.35 Background This Statement of Work (SOW) establishes and defines the requirements for the engineering, furnishing, installation, testing and documentation of inside and outside plant fiber optic and copper cabling at Cheltenham, MD. Scope of Work The contractor shall provide all personnel, equipment, tools, materials, supervision, and all other components necessary to install, test and document inside and outside plant fiber optic and copper cabling at Cheltenham, MD. All work performed in the design and installation shall conform to BICSI (Building Industry Consulting Services International) specifications to ensure consistency with current codes, standards, and regulations. The following BICSI publications apply. Outside Plant Design Reference Manual, 4th Edition and Telecommunications Distribution Methods Manual, 12th edition. General. Cable Testing. All copper cables will be tested in accordance with BICSI specifications to ensure no damage has occurred to the cable during installation. All copper cables shall be tested for cable faults prior to and after installation has been completed. If the cable is damaged during installation, the contractor shall replace the cable with one that is undamaged. All cable terminals and information boxes interface units shall be labeled with machine-generated labels. All cables shall be labeled at all termination points, building entrance terminals, patch panels, manholes, hand holes, and at all splice entrance/exit points. Site Restoration. All non-paved surfaces (grass, sod, gravel, etc.) must be restored within 7 days. Trenches and splice pits must be mechanically compacted to compensate for future earth settlement. All roads, streets, sidewalks of concrete or asphalt construction must be restored or repaved within 3 days from the time of backfilling and compaction. Grounding. Contractor shall ensure all equipment are secured and grounded to industry standards. Description of Task Task 1: Material to Install Copper and Fiber Optic cable at the ARMAG Building at Cheltenham, MD. List of materials to be provided by the contractor. Approximately 650' Shielded Twisted Pair Copper Cable (STP) Approximately 350' 6 Strand Single Mode Fiber Optic Cable Two (2) Wal Mount 12 Port Fiber Optic Patch Panel Twelve (12) SC Type Fiber Connectors Four (4) Lightning Arresters One 17"x30"x18" Communications Handhole Approximately 300 Ft of 2" schedule 40 PVC conduit Task 2: Install Copper and Fiber Optic cable at the ARMAG Building at Cheltenham, MD. Contractor shall provide and install a 17"x30"x18" handhole 2" schedule 40 PVC conduit from the existing handhole near bldg. 53 into the new hand hole installed behind the ARMAG bldg. (See Aerial Photo in Attachment 1 below) Contractor shall provide and install a 2" schedule 40 PVC conduit from the existing handhole near bldg. 53 into the new hand hole installed behind the ARMAG bldg. Contractor shall provide and install two (2) outside plant grade CAT 6 cable through the newly installed handhole and conduit into the ARMAG building. Contractor shall terminate both ends of the STP cable onto a lightning arrester terminal. Contractor shall provide and install a twelve (12) strand single mode fiber optic cable from bldg. 53 IT closet through the conduits and manholes into the ARMAG bldg. Contractor shall terminate both ends of the 12-strand fiber cable onto fiber optic patch panel using SC fiber optic connectors. Contractor shall tag and label the cable and terminal. Contractor shall test label and tag the terminal, cables, and patch panels.

Award

Military

$17,455.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
84
Bidding Soon
2,026
All Active Projects
763
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2023

September 14, 2023

img_map_placeholder

9000 Commo Rd, Cheltenham, MD

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.