BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 18, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a mixed-use development in Glendale, California. Completed plans call for the renovation of a fire / police facility.

Contractor shall furnish labor, materials, equipment, services, and specialized skills to perform work involved in the Project. The Work in the Bid is defined in the Project Specifications and will generally include, but not limited to. Completion: This Work must be completed within 60 calendar days from the Date of Commencement as established by the Citys written Notice to Proceed. Each Bid must be made on the Bid Forms obtainable at the Public Works Facilities Management Division. Each Bid shall be accompanied by a cashiers check or certified check drawn on a solvent bank, payable to City of Glendale, for an amount equal to ten percent (10%) of the total maximum amount of the Bid. Alternatively, a satisfactory corporate surety Bid Bond for an amount equal to ten percent (10%) of the total maximum amount of the Bid may accompany the Bid. Said security shall serve as a guarantee that the successful Bidder, within fourteen (14) calendar days after the Citys Notice of Award of the Contract, will enter into a valid contract with the City for said Work in accordance with the Contract Documents Glendale Police Department Remove and dispose of 50,000 sq. ft. of existing flooring material. Install 50,000 sq. ft. of new Mowhawk Group New Basics III BT 400 / 978 Mineralite carpet tile provided by the city. Provide and install rubberized cove base on all areas where carpet meets the wall. Provide and install rubberized transitions where flooring materials differ in thickness. Glendale Fire Station 21 Remove and dispose of 35,000 sq. ft of existing flooring material. Install 10,000 sq. ft. of new Philadelphia Capital III Tile / 80572 Governor carpet tile provided by the city. Install 25,000 sq. ft. of new Philadelphia In The Grain II / 00568 Flaxseed High Performance LVT tile provided by the city. Provide and install rubberized cove base on all areas where flooring materials meets the wall. Provide and install rubberized transitions where flooring materials differ in thickness.

Award

Fire / Police

$256,946.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
661
Active Projects
265
Bidding Soon
3,312
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 26, 2023

August 25, 2023

Project location map

Multiple Locations, Glendale, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.