BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Honolulu, Hawaii. Contact the soliciting agency for additional information.

Verify and calibrate all highway construction material testing lab and field equipment listed in the line items and attachments and as described below. Provide services within the State of Hawaii on the islands of Oahu, Maui, Kauai and Hawaii. Location of the various Labs and Field Offices are included on the attachments. Out-of-state travel to the State of Hawaii and travel inter-island must follow with COVID-19 travel advisories of the State of Hawaii and its Counties i.e. Honolulu, Maui, Kauai and Hawaii. Line Item #1 Fall: 9-1-23 to 12-31-23 - Counties - Honolulu, Maui, Kauai and Hawaii Line Item #2: Spring 3-1-24 to 5-1-24 - County - Honolulu Calibrating technician shall follow manufacturers instructions and be familiar with the equipment and controls. Equipment shall be verified according to the latest updates to AASHTO R18 & R28 and calibrated as needed. Quotation is for the verification and calibration of all equipment at the lab and field office locations listed on the attachments. Calibration certification is for a period of 1 year unless noted otherwise. Documentation shall include calibration reports and traceability of standards used. Deliver Report/Certificate of Calibration/Verification including: a. Name of technician performing calibration/verification. b. Date calibration/verification was performed. c. Equipment and/or standards used to perform calibration/verification. d. Procedures used in calibration/verification. e. Test data from calibration/verification. f. Description of any corrective measures performed. Special Requirements for Satec test machine as listed on the attachment Oahu Honolulu Central Lab [year]: Experience in using Satec/Instron Nu Vision Partner Software test procedure or a Satec/Instron approved program is required to operate the machines closed loop controls during the verification. During the verification procedure, the spherical head shall be protected with a full plate to prevent any damage from the load-verifying device. Load verifications shall be performed throughout the digital output range. Provide document demonstrating calibration standard traceable to NIST. Direct all questions regarding this Solicitation, and any questions or Issues relating to the accessibility of this Solicitation (Including the appendices and exhibits to this Document, and any other document related to this Solicitation), to: Ikehara, Brian.

Post-Bid

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
2
Bidding Soon
87
All Active Projects
43
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 27, 2023

August 28, 2023

img_map_placeholder

Multiple Locations, Honolulu, HI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.