BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in New York, New York. Completed plans call for the renovation of a educational facility.

Description: New Fire Alarm/Public Address/Clock/Smoke Purge Systems Bond Requirements (Not Applicable for Mentor Projects) A. In connection with its Bid, the Contractor provided an appropriate bid bond/certified check, in the amount of five (5%) percent of its Bid Amount. B. Contractor has obtained and agrees to maintain in effect for the Performance Period a Construction Performance Bond on the form attached hereto as Appendix D. C. Contractor has obtained and agrees to maintain in effect for the Performance Period a Labor & Materials Payment Bond on the form attached hereto as Appendix E. Performance Period:330 Continuous Calendar Days (See Page CC-3 and Appendix B) Liquidated Damages: One Thousand ($1,000) Dollars per Continuous Calendar Day and as set forth in the Construction Contract if the Contractor's Bid Amount is over Three Million ($3,000,000) Dollars, then the Contractor and its Subcontractors of any tier performing Work will abide by the provisions of the PLA, and will have agreed to become signatory to, and to be bound by, via execution of the PLA Letter of Assent. All questions by prospective bidders concerning this solicitation should be directed, in writing at least three (3) business days prior to the originally scheduled, or, if applicable, postponed bid opening date to rfimentor@nycsca.org using the project solicitation number in the subject line as indicated in the following example: RFIMENTOR 25-12345D-1 Smith and Jones Construction. Please send all Questions to rfimentor@nycsca.org. however, if you have any additional questions or issues please contact Janet Kalin, Contract Administrator at E-mail: JKalin@nycsca.org or at Phone Number: (718) 472-8204. Estimated budget is between $500,001 - $1,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. SCOPE OF WORK A. Provide labor, materials, tools, machinery, equipment, and services necessary to complete the HVAC Work under this Contract. All systems and equipment shall be complete in every aspect and all items of material, equipment and labor shall be provided for a fully operational system and ready for use. Coordinate the work with the work of the other trades in order to resolve all conflicts without impeding the job progress. B. Examine the Architectural, Structural, Plumbing and Electrical Drawings and other Divisions, and Sections of the Specifications in order to determine the extent of the Work required to be completed under this Division. Failure to examine all the Contract Documents for this Project will not relieve the Contractor of his/her responsibilities to perform the Work required for a complete fully operational and satisfactory installation. C. The Work includes but is not limited to the following systems, equipment and services: Replace electrical actuators on all existing fire smoke dampers associated with Smoke Purge System. D. Start-up services shall be included in the bid. E. All systems, equipment and services specified herein shall be provided complete and ready for use. F. Not used.

Bid Results

Educational

$870,000.00

Public - City

Renovation

76

15

6

5

Subscribe For Documents

80 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
467
Active Projects
241
Bidding Soon
4,647
All Active Projects
2,151
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 6, 2024

October 7, 2024

img_map_placeholder

70-02 54th Ave, New York, NY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.