BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for an educational facility in Palatka, Florida. Completed plans call for site work for a educational facility; and for paving for a educational facility.

The work includes installing temporary erosion control measures, clearing, grubbing, concrete sidewalk, pedestrian guiderail, sod placement, seeding, and other incidental work. Ancillary activities include erosion and scour protective measures, permanent signage and road markings as needed. The project limits extend along Old Jacksonville Road from Eddie Vreen Road to N. 19th Street for a total length of approximately 1,000 ft. Preconstruction Conference Tuesday, September 26, 2023 , Project Completion Date Tuesday, December 5, 2023* *(70 Days from Pre Construction Meeting/Receipt of Notice to Proceed) Question Deadline: 08/02/2023 at 2:00 PM Questions concerning the specifications may also be emailed to Leigh Doran, Procurement Supervisor, at leigh.doran@putnam-fl.gov. Each Bidder is reminded that time is of the essence of this Agreement, and failure to complete the Work on time shall constitute a material breach of the Agreement, the basis for a determination of the default of the CONTRACTOR, and termination of the Agreement for cause. If the Contract/Bid Documents so indicate, an amount determined for liquidated damages at the rate specified shall be assessed against the successful Bidder not complying with a stated delivery time or performance time. Bid bond - each bid must be accompanied by a bid bond payable to the county for five percent (5%) of the total amount of the bid. As soon as the bid prices have been compared, the county will return the bonds of all except the three lowest responsible bidders. When the agreement is executed, the bonds of the two remaining unsuccessful bidders will be returned. The bid bond of the successful bidder will be retained until the payment bond and the performance bond have been executed and approved, after which it will be returned. A certified check may be used in lieu of a bid bond. Performance bond in the amount of 100% of the contract price, from a corporate surety approved by the county will be required. Payment bond in the amount of 100% of the contract price, from a corporate surety approved by the county will be required.

Bid Results

Educational

$382,117.00

Public - County

Paving, Site Work

19

8

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
51
Bidding Soon
1,074
All Active Projects
456
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 11, 2023

September 11, 2023

img_map_placeholder

1400 Old Jacksonville Rd, Palatka, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.