BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a warehouse / distribution facility in Starke, Florida. Completed plans call for the renovation of a warehouse / distribution facility.

General Project Description (Reroof and Waterproofing): Pressure wash the existing granulated roofing cap sheet from low sloped roofs, to remove loose granules and mildew, cut out and patch blisters, where required, remove skylights, fill in and other roof penetrations from equipment relocation, removing the foil facing from the parapet and rooftop curbs. Fully adhere an 80 mil PVC fleece backed single ply cap sheet with 60 mil flashing for the 'hybrid' system to meet the manufacturer's 20-year NDL warranty. At metal roofs pressure washing the existing metal roof panels, replacing loose and backed out fasteners with new stainless steel fastener 1/8" size larger than the existing, cut out and reseal deteriorating sealant with new premium polyurethane sealant, and applying an elastomeric roof coating to provide a 20-year manufacturer's warranty. Remove and replace the edge/eave hung gutters and downspout with new prefinished aluminum gutter and downspout system. Install lightning protection system as required to meet UL master label and NFPA compliance. Pressure wash the building exterior CMU walls to remove the loose coatings, mildew, and efflorescence and mineral deposits from surfaces. Patch and repair damaged and cracked mortar joints where needed. Clean and cut out existing sealants at penetrations and apply premium polyurethane sealant prior to coating. Apply specified coating system on exterior walls including previously painted signage. Pressure wash the building exterior metal wall system to remove the loose coatings and mildew. Replacing severely rusted fasteners, securing backed out (loose) fasteners and applying a coating system on exterior metal wall panels. Clean and cut out existing sealants at penetrations and apply premium silicone sealant after coating. Remove and replace existing windows with new energy efficient fixed aluminum windows sized to fit the existing openings. Remove and replace existing exterior entry doors and hardware and exterior lighting mounted to building. Remove and reinstall all existing exterior mounted equipment and signage unless scheduled for demolition. ABI# 1: Mechanical Systems: remove existing rooftop equipment, liquid propane and fuel tanks. Install new mechanical systems, liquid propane tank and associated electrical work, and new electrical panel. Provide new cat6 cabling to 2 separate drops, located near new power receptacles along new mechanical room 110 wall, testing per g6 standards ensuring functionality. ABI# 2: Vault: replace vault door to be large enough for pallet jack. Add caging at entrance. Include all necessary component to meet required standards. Install new dehumidifier. ABI# 3: Warehouse Lighting: replace all warehouse lighting including overhead lights, exterior lights and exit signs in warehouse. New control panels and emergency inverter panels. New fire alarm tie-ins for emergency lighting override. ABI# 4: New Latrine: new latrine in warehouse 4 with necessary components, to include but not limited to electric, mechanical systems, water, sewer, and fixture. ABI# 5: Loading dock, gate openers: extend loading dock with overhead canopy, stairs and all required components. Install new electrified south exit gate with automatic opener, asphalt fill and all required components to complete operational system. Replace north entry gate with new to match existing. Remove existing fencing associated with center loading dock gate and install new where indicated. Carefully salvage center loading dock gate and access equipment and reinstall at new location where indicated. ABI# 6: Existing Latrine by Loading Dock: upgrade existing latrines by loading dock. Replace plumbing fixtures, light fixtures, exhaust fans and finishes. ABI# 7: Electrical Upgrades: add motors to 7 new exterior overhead doors. Add outlets for wrapping machine and forklift charger. ABI# 8: Laundry: add washer, dryer, exhaust, water heaters, water supply and sanitary connections in warehouse 2, east end with 2 sinks and all necessary components. ABI# 9: Roll up doors and hardware: replace doors, hardware, kick plates, thresholds and rekey as required. ABI# 10: Add electric water coolers with bottle fillers with associated water supply, sanitary and power. ABI# 11: Interior Finishes: removal of carpeting in office areas, install new and patch and paint walls. New act in office areas, signage replacement, and minor wall modifications as necessary. Replace light fixtures and lighting controls in office areas. ABI# 12: G6 Standards: upgrade to g6 standards including all telecommunication scope.

Post-Bid

Warehouse / Distribution

$3,000,000.00

Public - Federal

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
97
Bidding Soon
1,490
All Active Projects
592
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 25, 2023

August 25, 2023

img_map_placeholder

5629 FL-16, Starke, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.