Site work and outdoor lighting for a civil project in Austin, Texas. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

As of 10/12/2023, this project has not yet been awarded. It is anticipated to be awarded on 11/9/2023. The Work consists of roadway lighting installation including installing new wooden and steel utility poles with mast arm lighting, installing new lighting on existing utility poles, and installing new LED luminaires to replace existing high pressure sodium lights. This contract includes work on two (2) road corridors: Slaughter Lane from Riddle Road to Brandt Road, approximate project length is 3.56 miles; Howard Lane from Scofield Ridge Parkway to Dessau Road, approximate project length is 3.11 miles. Some work will occur inside electrical high-voltage zone, which is defined as within five (5) feet of the primary electric distribution lines. All work occurring within the high-voltage zone must be performed by an Austin Energy (AE) Qualified Electrical Contractor (QEC), irrespective of whether they are a prime or subcontractor. Vegetation Management may be an applicable scope of work including related line clearing needed near high-voltage zone. Section 00400 contains information about becoming an AE QEC and specific requirements for vegetation management. This is a public safety roadway lighting project of the City of Austin Transportation and Public Works (TPW) Department. These public safety roadway lighting projects are being implemented by the TPW Department in service to its Vision Zero program which strives to end traffic related fatalities and serious injuries on city roadways. The street lighting infrastructure will be owned and maintained by the City of Austin and its wholly owned Austin Energy Department. All Bids shall be accompanied by an acceptable Bid guaranty in an amount of not less than five percent (5%) of the total Bid, as specified in Section 00100, Instructions to Bidders. Performance and payment bonds when required shall be executed on forms furnished by OWNER. Each bond shall be issued in an amount of one hundred percent (100%) of the Contract Amount by a solvent corporate surety company authorized to do business in the State of Texas, and shall meet any other requirements established by law or by OWNER pursuant to applicable law. The DBE participation goal that applies to this solicitation is as follows: 0.00 % Minimum wage rates have been established and are specified in Section 00830, Wage Rates and Payroll Reporting. Contract Time is of the essence and all Work shall be substantially completed within Three Hundred and Sixty (360) Calendar Days after date specified in the Notice to Proceed, in accordance with the Bid Form, Section 00300. Final completion shall be achieved within Forty (40) Calendar Days after substantial completion. Liquidated damages are One Thousand Five Hundred and Fifty Dollars ($1,550) per Calendar Day for failure to substantially complete the work and Eight Hundred and Forty Dollars ($840) per Calendar Day for failure to achieve final completion within Forty (40) Calendar Days after substantial completion, in accordance with the Bid Form, Section 00300. OWNER reserves the right to reject any or all Bids and to waive any minor informality in any Bid or solicitation procedure (a minor informality is one that does not affect the competitiveness of the Bid).

Bid Results

Roads / Highways

$2,556,625.00

Public - City

Outdoor Lighting, Site Work

202

14

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
279
Active Projects
148
Bidding Soon
3,628
All Active Projects
1,357
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 10, 2023

October 9, 2023

November 12, 2024

img_map_placeholder

Multiple Locations, Austin, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.