Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Los Angeles, California. Contact the soliciting agency for additional information.
The Trustees of The California State University are requesting Statements of Qualifications (SOQ) from interested and qualified design-builders (Respondents) to provide design, preconstruction, and design-build construction services for the above-named Project. The Trustees will select a design-build team consisting of a general contractor and architect (Design-Builder) using a two-step process: (1) this Request for Qualifications (RFQ) from which Respondents may submit SOQ to the Trustees, and (2) the Request for Proposals (RFP) which the Trustees will issue to the shortlisted firms. A technical review committee shall review the respondents' SOQ and, based on the criteria identified in the RFQ, the committee shall select no more than five finalists to receive the Request for Proposals. Selection of the winning Proposer will be based on qualifications and proposed fees (a design competition is not utilized). Collaborative Design-Build is a two-phased delivery process: Design Phase and Design-Build Phase, and the Trustees will issue a separate contract for each phase. The Project consists of: 1. The Total Budget for Phase 1 & Phase 2 is approximately $1,400,000 but is subject to revision during the RFP process based on proposer feedback. 2. There is not a critical schedule for the project, but priority during the selection process will be given to teams that can complete the project the soonest with the least amount of disturbance to building operations and the occupants. Our goal is to have the project completed no later than December 2024. 3. Base Scope - The Plant Renewal project is intended to renew, repair, and replace various components of the existing mechanical system. The project will generally include the following main components: a) Removal of the existing supply fan and return fans b) Installation of new supply and return fan walls, backdraft dampers, VFDs, and controls. c) Incorporation of the new controls SOOs into the existing BMS. d) Test and balancing. e) Commissioning. 4. Add Alternates - The following items will be included based on budget feedback from the design-build team during the RFP process and/or during phase 1. a) Replacement of the primary plant controller. b) Reprogramming and recommissioning of the existing plant controls SOOs (CHW, CW, HW, and AHU) to current code. (note that all the building VAVs and associated controls were recently replaced). c) Repair or replacement of the compressor on the primary chiller. d) Repair major existing ductwork damage. 5. The Design-Build Team is expected to self-perform at least the primary mechanical scope, but the controls, electrical, and other work may be self-performed if the work falls within the licensing and expertise of the design-build team. Preference will be given to teams the propose the largest amount of self-perform work. 6. The Design-Build Team shall be responsible to subcontract with design professionals as required to submit a complete package for permitting. 7. This is not multi-prime, so the University will not be hiring any other contractors directly. The Design-Build Team shall be willing and able to either self-perform or subcontract for all portions of the work. 8. Since the system is in an active occupied building, the desire is to schedule the work to limit disruption to the occupants, such as performing the work over a few weekends in phases and/or over winter holiday break. We will solicit feedback from the proposers during the RFP process and provide preference to teams that have creative solutions to limiting the impact on facilities operations. 9. Additional information can be found in the Appendix.
Post-Bid
Educational
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2023
January 1, 2024
5151 State University Dr, Los Angeles, CA
Related To This Project
Los Angeles, CA
--
Los Angeles, CA
Bid Date: Feb 03 2017
Los Angeles, CA
--
Los Angeles, CA
Bid Date: Jul 27 2023
Los Angeles, CA
Bid Date: Sep 09 2019
Los Angeles, CA
Bid Date: Aug 20 2019
Los Angeles, CA
Bid Date: Jun 17 2020
Los Angeles, CA
Bid Date: Apr 01 2021
Los Angeles, CA
--
Los Angeles, CA
Bid Date: Oct 26 2023
Los Angeles, CA
Bid Date: Jul 14 2023
Los Angeles, CA
Bid Date: Jul 14 2023
Los Angeles, CA
Bid Date: Jul 25 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.