Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 29, 2025 at 8:00 PM
Updated April 30, 2025
Site work and paving for a mixed-use development in Portage, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.
https://www.mlive.com/news/kalamazoo/2025/04/9-major-road-construction-projects-to-watch-in-kalamazoo-county-in-2025.html KALAMAZOO COUNTY, MI — Flowers are blooming, birds are singing and orange barrels are popping up along Michigan roadways. It’s spring in Kalamazoo County. Some projects are already underway, with others coming soon. Here’s a look at the expected start, end and closure dates for nine of the most impactful projects planned for Kalamazoo County in 2025. City of Kalamazoo City officials promise this year’s construction season will be more manageable than last year’s. The two-way conversion of Kalamazoo Avenue, originally slated to begin this year, has been pushed back due to federal funding delays. But there are still several significant projects on the schedule. 1. Eliminating a floodplain on Westnedge Avenue This $9 million project will eliminate flooding along Westnedge Avenue near the coming downtown arena site. Underground water and sewer lines will be updated with larger pipes, per city documents. This work is supported by a $38 million federal grant and $5.8 million from the event center developer, according to city documents. Work is on Westnedge Avenue between Kalamazoo and Michigan avenues is expected to start in June, Baker said. The project should last through November. Westnedge Avenue traffic will be detoured onto Michikal Street and Michigan Avenue, Baker said. 2. Paving a different section of Westnedge Avenue Traffic on Westnedge Avenue will shift to accommodate repaving between Vine Street and Michigan Avenue. The work will cost $860,623 — it’s covered in part by MDOT funds and $68,391 from the city. Construction is slated to begin June 9 and end mid-August. 3. Gull Road bridge work Work on Gull Road as it passes over the Kalamazoo River will kick off the season on Tuesday, April 15. The $350,450 bridge maintenance project is expected to wrap up in August, Public Services Director James Baker said. This project won’t require any detours, Baker said, but traffic will shift to just one lane of traffic in both directions while work is underway. Portage 4. South Westnedge Avenue reconstruction The city of Portage is reconstructing part of South Westnedge Avenue for $1.9 million this summer. The 1.3-mile stretch of road between Osterhout Avenue and South Shore Drive was rated “poor” in a 2022 state road assessment. Underground work will require reconstructing the road, per city documents. Work is slated to begin April 28 and wrap up in September, said Portage spokesperson Mary Beth Block. The project is funded 100% by local funds with no state or federal participation, according to city documents. 5. West Milham Avenue reconstruction Reconstruction on West Milham Avenue will be less intrusive than work on South Westnedge Avenue, Block said. Underground fiber is going in between 12th Street and Oakland Avenue, Block said. The $3 million project will require traffic shifts into a turn lane along the route, but travel through the area will be maintained while work is underway June through September. RELATED: $3M construction project planned for major Portage street this summer Road Commission of Kalamazoo County 6. Sprinkle Road Work on Sprinkle Road in Comstock Township is facing setbacks after a driver ran over a freshly-poured concrete median on April 10, per Road Commission of Kalamazoo County officials. Sprinkle Road median Construction workers assess damage to a freshly-poured median on Sprinkle Road. The destruction will set the project back, officials said.Road Commission of Kalamazoo County Work between I-94 and Road 581 includes a new concrete shoulder, concrete median, rumble strips and paving. One lane is closed in both directions while work is underway. MDOT work on U.S. 131 7. Business loop interchange A $19 million highway project will add connections between U.S. 131 and the business loop north of downtown Kalamazoo. The project includes adding two more ramps – from northbound U.S. 131 onto the business route and from the business route onto to southbound U.S. 131 (as shown in orange on the map, below). Proposed U.S. 131 interchanges The orange lines represent the proposed routes of two new interchanges connecting U.S. 131 and U.S. 131 Business Route in Kalamazoo County. Both of the new ramps will require a new bridge, per MDOT. Work began at the end of February and is expected to wrap up in November. Road work will require total closures on five weekends, which are still to be announced. Otherwise, both highways will remain open to traffic with single-lane closures during the project. 8. U.S. 131 at West Main Street MDOT is making changes to the U.S. 131 and West Main Street/M-43 interchange, among other upgrades in the area. The $10 million project entails widening West Main Street, removing a southbound off-ramp and adding traffic signals to the intersection. Exit 38A on southbound U.S. 131 will not be replaced, per MDOT. Instead, the 38B exit ramp will have a new traffic light added at West Main Street so traffic can turn in both directions. Closures, costs and renderings will be available once a contractor has signed on for the work, MDOT spokesperson Nick Schirripa said previously. 9. New bridges over KL Avenue, train tracks US 131 bridge construction U.S. 131 bridges over KL Avenue and the Amtrak railroad shown in a Google Maps image. The bridges will be rebuilt in a project beginning in 2024 and finishing in 2026, MDOT said. (Google Maps)(Google Maps) Crews are on Year 2 of a three-year, $24 million effort to replace U.S. 131 bridges over KL Avenue and Amtrak rail lines. That project resumed on March 10 and is expected to last through November. U.S. 131 bridges over KL Avenue and the Amtrak railroad shown in a Google Maps image. The bridges will be rebuilt in a project beginning in 2024 and finishing in 2026, MDOT said. KL Avenue is closed while crews work on two bridges carrying highway overhead, per MDOT. The Stadium Drive ramp to northbound U.S. 131 is closed through June 26, per MDOT. A detour will take drivers along Stadium Drive, Drake Road and West Main Street. Two lanes in both directions will remain open on U.S. 131 while work is underway, though lanes will shift to a temporary bridge as work progresses. ---------------------------------------------------- Reference Number 0000377355 The City of Portage invites interested Contractors to submit a sealed bid for the provision of construction services for the road reconstruction of South Westnedge Avenue from Osterhout Avenue to South Shore Drive to include water main lining and replacement, crush and shape, storm drainage improvements, sidewalk installation, resurfacing and restoration. Question Acceptance Deadline 03/05/2025 05:00 PM EST Questions are submitted online No Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 25 % - Labor and Materials Bond 100 % - Payment Bond 100 % Question Deadline 03/05/2025 at 5:00 PM ET Questions are submitted online No Questions and requests for clarification related to definition Victoria Barboza, Purchasing Manager purchasing@portagemi.gov The City reserves the right to reject any or all bids, to waive any irregularities, and further reserves the right to accept any bid or parts of bids which it deems to best serve the interest of the City. Award will generally be made to a single bidder on each entire lot. However, the City reserves the right to award by line item within any lot which it deems to best serve the interest of the City. In addition, contracts will be awarded pending City Council budget approval.
Bid Results
Roads / Highways
$1,962,291.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 13, 2025
April 28, 2025
S Westnedge Ave, Portage, MI
Related To This Project
Portage, MI
Bid Date: Oct 16 2023
Portage, MI
Bid Date: Sep 05 2023
Portage, MI
Bid Date: Aug 23 2023
Portage, MI
Bid Date: Oct 18 2023
Portage, MI
Bid Date: Sep 12 2023
Portage, MI
Bid Date: Dec 15 2021
Portage, MI
--
Portage, MI
Bid Date: Aug 10 2023
Portage, MI
Bid Date: Jul 26 2023
Portage, MI
Bid Date: Jun 21 2023
Portage, MI
Bid Date: Jul 10 2023
Portage, MI
Bid Date: Jun 14 2023
Portage, MI
Bid Date: Jun 02 2023
Portage, MI
Bid Date: Feb 01 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.