BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, new construction and addition to a fire / police facility in Myrtle Beach, South Carolina. Working plans call for the addition of a fire / police facility; for the construction of a fire / police facility; and for site work for a fire / police facility.

As of 9/8/2023, the owner has determined a short list of contractors. The Work of Project is defined by the Contract Documents and consists of the following: This project consists of alterations and additions to the existing Fire Station No. 3 building as well as a new 11,000 sf Fire Station No. 3 building with new parking lot, drainage, utilities and landscaping. This Complex will be designed to withstand a 180mph wind speed. The existing 10,700 sf facility will be renovated into a new Training Center with a 6,300 sf Administration area added. All new work will be slab on grade, concrete spread footing foundation with load bearing masonry walls, brick veneer exterior with smooth face CMU accent bands with aluminum roof structure entry features. All structures (existing and new) will receive new aluminum curtain wall fenestration as well as a modified bitumen membrane roof, plumbing, fire protection, HVAC, electrical and telecommunications. Interior finishes will include porcelain tile, luxury vinyl tile, acoustic ceiling tiles and other finishes. The Fire Station will also utilize bi-fold and overhead Bay Doors. Work shall be completed in Phases as explained in Article 1.4 of this Section and Section 004113 - Bid Form - Stipulated Sum. The City of Myrtle Beach seeks to obtain qualifications of professional contractors for the construction services of the Myrtle Beach Fire Station #3 Complex, including additions and alterations to existing buildings, along with the construction of a new fire station located nearby. The project is located on the owner's existing property at 2108 South Kings Highway, Myrtle Beach, SC 29577. Questions regarding this RFQ must be submitted in writing via e-mail to asowers@cityofmyrtlebeach.com All questions received by the deadline of 10:00AM (local time) on Monday, August 7, 2023 will be answered via addendum. Construction budget (materials and labor) is estimated at: $8,200,000

Final Planning

Fire / Police

$8,200,000.00

Public - City

Addition, New Construction, Site Work

141

24

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
44
Bidding Soon
517
All Active Projects
253
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2023

February 8, 2024

img_map_placeholder

2108 S Kings Hwy, Myrtle Beach, SC

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.