BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Athens, Texas. Completed plans call for site work for a water / sewer project.

Removal of filter media: Contractor shall remove all filtration media from Filter #1 Basin. Contractor shall carefully collect the top layer (approximately 24 inches) of anthracite filter media and place it in 2,000 pound capacity polypropylene bulk bags (Super Sacks). The bulk bags shall then be stored in an area of the treatment facility designated by plant operating staff. The remaining material - silica sand, garnet sand, and garnet gravel, shall be disposed of in owner provided roll-off dumpsters. Underdrain Cleaning: Contractor shall unfasten and remove all stainless steel underdrains from filter basin being careful to retain all fastening materials for later reuse. Following removal, cleanly remove the end cap of each underdrain to facilitate a complete cleaning of the underdrain tube interior. Removal of the end cap may require cutting the stainless steel endcap off in a manner that will allow for reattachment after cleaning of the underdrain. Completely clean and rinse all filter media and debris contained within the interior of the underdrain tubes. Contractor shall reattach end caps following underdrain cleaning. Only stainless steel filler rod will be permitted for the reattachment of the endcap if removed by cutting. TIG welding using 100 % Argon shielding gas will be the only approved method for reattachment of endcaps. Contractor shall ensure no openings or gaps remain after reattaching end caps. Reset underdrain: Prior to resetting underdrains, Contractor shall coordinate with plant operators to flush the underdrain piping into the filter basin to remove any media or debris located within the piping. Contractor shall remove debris, if any, deposited in the filter basin following the flushing. Note: Any draining of the filter will require the use of a sump pump. Contractor shall replace all underdrain gaskets prior to setting underdrains. Gaskets may be purchased from the manufacturer. Item number 247223, 4 inch diameter, quantity - 20. Manufacturer recommends using an NSF approved lubricant on the inside of the gaskets and the drop pipe to avoid any damage to the gaskets. Contractor shall reuse existing fasteners to reattach screen to filter basin floor. Any floor anchors discovered in poor condition, damaged, or loose may be replaced using type 316 stainless steel concrete anchors and approved concrete epoxy. Underdrain shall be mounted to floor in a manner consistent with manufacturer recommendation to avoid damaging or deforming underdrain openings. Underdrain system presently in use is a Triton Underdrain as manufactured by Johnson Screens. Testing Contractor shall coordinate with plant operating staff to perform an air scour with the water level no more than 24 inches above the underdrains. This test is to observe the air distribution pattern to ensure all gaskets are in the correct location and have not torn, rolled or otherwise been damaged in the installation process as well as checking for any deformation of the underdrains. Contractor shall be responsible for correcting deformations, gasket leaks, etc., prior to placement of media. Media placement Contractor shall provide and place new media in the Filter #1 Basin in the following order: Garnet Gravel, Garnet Sand, Silica Sand and finally Anthracite. All individual filter media layers must be level before moving onto the next layer. A filter backwash must be performed after the Silica Sand is added and before the Anthracite is added. For additional information, submit questions only via email to officemgr@athenstxwater.org. The Athens Municipal Water Authority reserves the right to reject any/or all bids and to waive formalities. If you have any questions or need additional information, contact: Mike Finney, City of Athens Water Superintendent mfinney@athenstx.gov Question Deadline 08/21/2023

Award

Water / Sewer

$99,928.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
298
Active Projects
173
Bidding Soon
4,254
All Active Projects
1,724
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 28, 2023

September 27, 2023

img_map_placeholder

To Be Determined, Athens, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.