BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Templeton, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The work to be done at the location shown on the plans includes construction of the North Ridge Addition Plat 2 - Phase 1 including all labor, materials and equipment necessary for pavement removal, approximately 514 SY of 7" PCC street pavement, 15 LF of PCC curb and gutter, 32 SY of PCC sidewalk, 232 LF of 6" water main, subgrade preparation, modified subbase, and miscellaneous associated work, including cleanup. The work shall be substantially completed with the site stabilized by November 17, 2023. Final seeding shall be completed by May 31, 2024. Liquidated damages in the amount of Two Hundred Fifty Dollars ($250.00) per consecutive calendar day will be assessed for each day that the work shall remain uncompleted after the end of the contract period, with due allowance for extensions of the contract period due to conditions beyond the control of the Contractor. The Contractor will be paid ninety-five percent (95%) of the Owners final estimate of value of acceptable work completed. Final payment will be made not earlier than thirty-one (31) days after completion of the work and acceptance by the Owner. No such final payment will be due until the Contractor has certified to the Owner that the materials, labor and services involved in the final estimate have been paid for in full. The Contractor submitting the successful Quotation will be required to furnish bond in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety approved by the Owner and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment for all materials and labor and protect and save harmless the Owner from claims and damages of any kind by the operations of the Contractor, and shall guarantee the work against faulty workmanship and materials for a period of four (4) years after its completion and acceptance by the Owner. Bid security or bid bond not required The City of Templeton reserves the right to reject any or all Quotations, to waive informalities, and to enter into such contract as it shall deem to be in the best interest of the City of Templeton.

Bid Results

Roads / Highways

$209,984.00

Public - City

Paving, Site Work

11

3

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
46
Bidding Soon
728
All Active Projects
279
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 27, 2023

August 28, 2023

img_map_placeholder

Multiple Locations, Templeton, IA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.