Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a sidewalk / parking lot in Rockville, Maryland. Conceptual plans call civil work for a sidewalk / parking lot.
The increasing age of buildings has created a backlog of work to replace roofs on their expected 20 year life cycle. Roofs are replaced when schools are not in session, and are scheduled during the summer. This is an annual request, funded since FY 1976. An FY 2018 appropriation was approved for partial roof replacements at Brookhaven, Farmland, Fox Chapel and Greenwood elementary schools; and, Winston Churchill, Damascus, and Springbrook high schools. The request also will fund full roof replacements at Germantown, Highland View, and Poolesville elementary schools. An FY 2019 appropriation was requested for partial roof replacements at Highland, Jackson Road, and Sally K. Ride elementary schools; Julius West Middle School; Clarksburg, Damascus, and Springbrook high schools; and, a full roof replacement at Shady Grove Middle School. However, the County Council reduced the FY 2019 appropriation by $4 million. Therefore, the list shown above will be aligned with the approved funding level for FY 2019. An FY 2019 supplemental appropriation and offsetting reductions of $3 million were approved from this project to the current revitalization/expansion project for Seneca Valley High School. An FY 2020 appropriation was approved to continue this level of effort project for partial and full roof replacement projects at various schools throughout the county. An FY 2021 appropriation was requested for full and/or partial roof replacements at Bethesda and Damascus elementary schools, Kingsview, John Poole, and Westland middle schools. However, due to fiscal constraints, the County Council, in the adopted FY2021-2026 CIP reduced the FY2021 appropriation by $4 million less than the Board of Education's request. Therefore, the project list noted above will be aligned with the FY2021 approved expenditures. An FY 2022 appropriation and amendment to the FY 2021-2026 CIP was approved to continue this level of effort project for partial and full roof replacement projects at various schools throughout the county. The approved amendment for FY 2022 reinstates the expenditures that were removed as part of the adopted FY 2021-2026 CIP. An FY 2023 appropriation was approved to continue this level of effort project for partial and full roof replacement projects at 3 high schools and 9 elementary schools. An FY2024 appropriation is requested to continue this level of effort project for partial and full roof replacement projects at various schools throughout the county. This project is included in the county's fy 2023-2028 Capital Improvement Program. As of August 24, 2023, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Sidewalks / Parking Lot
$57,600,000.00
Public - County
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 7, 2024
Multiple Locations, Rockville, MD
Related To This Project
Rockville, MD
--
Rockville, MD
Bid Date: Oct 09 2023
Rockville, MD
Bid Date: Sep 15 2023
Rockville, MD
Bid Date: Sep 13 2023
Rockville, MD
Bid Date: Sep 29 2023
Rockville, MD
Bid Date: Oct 06 2023
Rockville, MD
--
Rockville, MD
Bid Date: Sep 13 2023
Rockville, MD
Bid Date: Aug 21 2023
Rockville, MD
Bid Date: Sep 25 2023
Rockville, MD
Bid Date: Jan 04 2024
Rockville, MD
Bid Date: Sep 25 2023
Rockville, MD
Bid Date: Sep 01 2023
Rockville, MD
Bid Date: Sep 14 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.