Site work for a water / sewer project in Springfield, Missouri. Completed plans call for site work for a water / sewer project.

The City of Springfield, Missouri entered into an Amended Consent Judgment (ACJ) with the Missouri Department of Natural Resources (MDNR) on or about May 12, 2012, pursuant to the Clean Water Act (CWA). Pursuant to the ACJ, the City is implementing a City wide Overflow Control Plan (OCP) to reduce sanitary sewer overflows (SSOs). The OCP includes both a public sewer rehabilitation program (known as Group projects) and a private sewer rehabilitation program (known as Phase projects) to reduce SSOs. The City has implemented Groups 1 through 7 of the public sewer rehabilitation and is ready for Group 8 Public Sewer Rehabilitation. Group 8 Public Sewer Rehabilitation will require several agreements to contract for different types of public rehabilitation, including but not limited to, agreements for 1) cleaning, CCTV and CIPP of sewer mains; 2) open-cut repair and/or rehabilitation of defects found in sewer mains and lateral connections; 3) trenchless repair and/or rehabilitation of defects found in lateral connections; 4) manhole rehabilitation; 5) grouting sewer main joints, manholes and lateral connections; and 6) pipe bursting. The Work to be performed pursuant to this notice is the Group 8 Public Sewer Rehabilitation Project- OPEN CUT REPAIRS. a) Open excavation of main line point repairs on sanitary sewer main ranging from 8- inch to 24-inch diameter and ranging in depth from 4 feet to greater than 20 feet deep. The majority of the main line point repairs will occur on mains of 8 inches to 12 inches in diameter. b) Open excavation of lateral connection repairs on sanitary sewer main ranging from 8-inch to 24-inch diameter and ranging in depth from 4 feet to greater than 20 feet deep. The majority of the lateral connection repairs will occur on mains of 8 inches to 12 inches in diameter. c) Open excavation to construct new 4-ft (ID) and 5-ft (ID) manholes or replace existing manholes on existing mains ranging from 8-inch to 24-inch diameter and ranging in depth from 4 feet to greater than 20 feet deep. The majority of the manhole locations will occur on mains of 8 inches to 12 inches in diameter. The Owner has reviewed CCTV and has designated specific locations of open cut lateral connection repairs and main line point repairs. The Owner has grouped those locations into an initial batch of work. A copy of Proposed Batch Order No. 1, schedules and location maps have been included in the bid documents as an example. The Proposed Batch Order No. 1 is not to be submitted with the bid documents. The bid opening will be based on the Total Base Bid for the entire length of the contract. Batch Order No. 1 will be finalized and issued after the contracts have been fully executed. The Owner will continue to review CCTV and will issue additional batches of work on an as-needed basis. The estimated quantities included in the Total Base Bid are not guaranteed and are solely for the purpose of comparison of Bids. The final payment for all Unit Price Bid items will be based on actual quantities completed as provided in the Contract Documents. Bid security must accompany each Bid. Each Bidder shall file with their Bid a cashier s check, certified check, or bidder s bond in the amount of 5 percent of the total amount of the Base Bid made payable to the City of Springfield, hereinafter referred to as the City or Owner. Failure to include the bid security will result in the bid being returned unread. The Successful Bidder will be required to furnish a construction performance bond and a construction payment bond as security for the faithful performance and the payment of all bills and obligations arising from the performance of the Contract. The Owner will evaluate Bids in accordance with the Instructions to Bidders. The Owner reserves the right to award the Contract in full, to reject any or all Bids, to waive informalities, and to reject nonconforming, non-responsive, or conditional Bids. Bidders must agree to comply with the Prevailing Wage Rate referred to in the bidding documents. Document Acquisition: Contractors may receive one (1) full set of either Electronic Files or Hard Copy documents at no charge. Additional copies (full sets only) may be obtained for the nonrefundable cost of reproduction. Specifications, including maps, are also available at Springfield Blue Print s online at electronically under the name of Springfield, MO-Sanitary Sewer Overflow Control Program, Group 8 Public Sewer Rehabilitation- Open Cut Repairs. For further information, contact Kimberly Brown, City of Springfield, Environmental Services Department, at (417) 864-1986. Neither Owner nor Engineer has any responsibility for the accuracy, completeness or sufficiency of any bid documents obtained from any source other than the source indicated in these documents. Obtaining these documents from any other source(s) may result in obtaining incomplete and inaccurate information. Obtaining these documents from any source other than directly from the source listed herein may also result in failure to receive any addenda, corrections, or other revisions to these documents that may be issued. Contractor shall furnish performance and payment bonds, each in an amount at least equal to the Contract Price as security for the faithful performance and payment of all of Contractors obligations under the Contract Documents.

Post-Bid

Water / Sewer

$300,000.00

Public - City

Site Work

49

11

5

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
18
Bidding Soon
347
All Active Projects
135
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2023

September 7, 2023

img_map_placeholder

Multiple Locations, Springfield, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.